FDOT Earthwork Level 1 |2024-2025
update|COMPLETE MOST TESTED QUESTIONS
AND VERIFIED ANSWERS (100% Correct
solutions)| GET IT RIGHT!! | ALREADY GRADED
A+
Terms in this set (93)
Nuclear Testing
Basics covered in Level 1 Speedy Moisture
Report Forms
Earthwork has to do with Earthwork is the excavation and placement of soils
the roadway in what and materials supporting the proposed roadway.
way?
In Earthwork what is a 6" of compacted depth at full width
lift?
In Earthwork what is a A lot is 1 lift at 500 ft or within compacted area.
Lot? Isolated compaction operations are separate lots.
Sampling at the roadway Done for base, sub grade, and embankment.
is done for
Sampling is determined generated with random numbers usually by a
how Verification Inspector
What is important about Minimum of three representative sample combined.
sampling at the roadway
What is LIMS? Laboratory Info Management System
The proctor theory is by inputting energy to expel air and water in the soil
when compaction is voids
achieved how
https://quizlet.com/965806125/fdot-earthwork-level-1-2024-2025-updatecomplete-most-tested-questions-and-verified-answers-100-correct-solutio… 1/8
, 11/2/24, 10:45 PM FDOT Earthwork Level 1 |2024-2025 update|COMPLETE MOST TESTED QUESTIONS AND VERIFIED ANSWERS (100% …
An increase in unit weight, decrease in
Compaction causes
compressibility and permeability.
The proctor is In a laboratory and establishes a density standard to
determined where and be used on the roadway
creates what
Material is gathered from the road and prepared
Lab proctors are created
with different amounts of water then placed in
how
molds and hammered
What is a modified It is used in base, sub grade, MSE wall back fill
proctor used in materials
Modified proctors are With a 10lb hammer(rammer) on a 18" drop with 56
created how blows per layers with 5 layers in total.
What is a standard It is used in embankment and structure back fill
proctor used in materials
Standard proctors are With a 5.5lb hammer(rammer) on a 12" drop with 25
created how blows per layer with 3 layers in total
Comparison between VT 2 lbs/pcf
and QC density test
tolerance
What is the STRG Sampling, Testing, and Reporting Guide (state wide)
A job guide schedule is project specific
The material 004L
identification number for
embankment in the
laboratory is
The material 004F
identification number for
embankment in the field
is
The material 030
identification number for
base is
PP is short for project personel
https://quizlet.com/965806125/fdot-earthwork-level-1-2024-2025-updatecomplete-most-tested-questions-and-verified-answers-100-correct-solutio… 2/8
FDOT Earthwork Level 1 |2024-2025
update|COMPLETE MOST TESTED QUESTIONS
AND VERIFIED ANSWERS (100% Correct
solutions)| GET IT RIGHT!! | ALREADY GRADED
A+
Terms in this set (93)
Nuclear Testing
Basics covered in Level 1 Speedy Moisture
Report Forms
Earthwork has to do with Earthwork is the excavation and placement of soils
the roadway in what and materials supporting the proposed roadway.
way?
In Earthwork what is a 6" of compacted depth at full width
lift?
In Earthwork what is a A lot is 1 lift at 500 ft or within compacted area.
Lot? Isolated compaction operations are separate lots.
Sampling at the roadway Done for base, sub grade, and embankment.
is done for
Sampling is determined generated with random numbers usually by a
how Verification Inspector
What is important about Minimum of three representative sample combined.
sampling at the roadway
What is LIMS? Laboratory Info Management System
The proctor theory is by inputting energy to expel air and water in the soil
when compaction is voids
achieved how
https://quizlet.com/965806125/fdot-earthwork-level-1-2024-2025-updatecomplete-most-tested-questions-and-verified-answers-100-correct-solutio… 1/8
, 11/2/24, 10:45 PM FDOT Earthwork Level 1 |2024-2025 update|COMPLETE MOST TESTED QUESTIONS AND VERIFIED ANSWERS (100% …
An increase in unit weight, decrease in
Compaction causes
compressibility and permeability.
The proctor is In a laboratory and establishes a density standard to
determined where and be used on the roadway
creates what
Material is gathered from the road and prepared
Lab proctors are created
with different amounts of water then placed in
how
molds and hammered
What is a modified It is used in base, sub grade, MSE wall back fill
proctor used in materials
Modified proctors are With a 10lb hammer(rammer) on a 18" drop with 56
created how blows per layers with 5 layers in total.
What is a standard It is used in embankment and structure back fill
proctor used in materials
Standard proctors are With a 5.5lb hammer(rammer) on a 12" drop with 25
created how blows per layer with 3 layers in total
Comparison between VT 2 lbs/pcf
and QC density test
tolerance
What is the STRG Sampling, Testing, and Reporting Guide (state wide)
A job guide schedule is project specific
The material 004L
identification number for
embankment in the
laboratory is
The material 004F
identification number for
embankment in the field
is
The material 030
identification number for
base is
PP is short for project personel