Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

Theory of Architecture reviewed questions with correct answers

Document preview thumbnail
Preview 1 out of 4 pages

Theory of Architecture reviewed questions with correct answersTheory of Architecture reviewed questions with correct answersTheory of Architecture reviewed questions with correct answersTheory of Architecture reviewed questions with correct answersTheory of Architecture reviewed questions with correct answers

Content preview

Professional practice architecture
questions with correct answers



an architect in violation of the aia code of ethics can have his license revoked or suspended by the AIA -
CORRECT ANSWER-false

as defined in the aia general conditions of the contract drawings and specifications are meant to -
CORRECT ANSWER-complement each other

bidding forms - CORRECT ANSWER-bidding requirements

change orders - CORRECT ANSWER-contract modifications

division 3 - CORRECT ANSWER-specifications

eligibility to take the architectural licensing exam is based on units of credits the combination of units must
total at least - CORRECT ANSWER-12

eligibility to take the certified interior designer licensing examination is based on units of credits. how many
units must they total - CORRECT ANSWER-7

exterior elevation - CORRECT ANSWER-drawings

fifth step to rfp - CORRECT ANSWER-successful firm determined

first step for rfp - CORRECT ANSWER-issue rfp

first step in DBB - CORRECT ANSWER-b101 is signed

five project phases in order for basic services - CORRECT ANSWER-schematic design
design development
construction doc
bidding negotiation
construction

fourth step for rfp - CORRECT ANSWER-interviews

fouth step in dbb - CORRECT ANSWER-owner hires general contractor

general conditions - CORRECT ANSWER-contract conditions

how many csi masterformat divisions are there - CORRECT ANSWER-50

idesntify four key preconstruction meeting agenda items - CORRECT ANSWER-schedule for payments
questions that the contractor need sthat were not already answered
alternate options
how the chain of communication will procure

Document information

Uploaded on
November 1, 2024
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
solutionsstudy
4.0
(2)
Sold
23
Followers
2
Items
599
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions