• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Quality Control Exam Questions with 100% Verified Answers

Document preview thumbnail
Preview 2 out of 10 pages

Quality Control Exam Questions with 100% Verified Answers

Content preview

Quality Control Exam Questions with
100% Verified Answers

Passing criteria for a class 1 LCD monitor, per AAPM: - ✔ ✔ -15 or fewer bad
pixels across entire screen.
-3 or fewer bad pixels within a 1cm circle.
-3 or fewer bad adjacent pixels.
*less stringent guideline for class 2 monitors.


Major disadvantage of LCDs is the rapid ______ of luminance at increasing
viewing angles. - ✔ ✔ Loss.


More expensive LCDs use what to increase the viewing angles? - ✔ ✔
Pixel elements that are slightly angled


VAD stands for what? - ✔ ✔ Viewing angle dependence.


VAD is measured how? - ✔ ✔ Photometer at a precisely maintained distance
from the center of the monitor screen, as a % of the perpendicular luminance.


How should the stability of the self-calibrating LCDs be monitored: - ✔ ✔
Everyday for 1st week.

, Every week for first month.
Every month for first quarter.


View box illuminates use what type of bulbs? - ✔ ✔ 2x 15-watt light bulbs behind
a light diffusing panel.

*bulbs should be regularly replaced. And surface of panel should be
regularly cleaned and checked for stains, cracks, or artifacts.


What is the greatest reason for repeats, this day in age? - ✔ ✔ Positioning errors.
*DR has reduced the rate of repeats due to poor technical quality.


In DR systems rejected images are usually ________, so there is no way of
tracking them and following up with repeat analysis. - ✔ ✔ Erased
and permanently lost.


What are a few categories in a DR system, to log for reasons for rejected images:
- ✔ ✔ -PACS problem.
-X-ray equipment problem.
-positioning error.


Some manufactures are beginning to incorporate specific software for what? -
✔ ✔ Repeat analysis.


A realistic target for XR depts is to maintain overall repeat rate due to
technologist errors at what %? - ✔ ✔ 3-5%

Document information

Uploaded on
October 31, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
417
Followers
105
Items
39867
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions