• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Chapter 1 Construction Methods and Materials Verified A+

Document preview thumbnail
Preview 2 out of 5 pages

Chapter 1 Construction Methods and Materials Verified A+ The Building Process From Idea to Reality ️️Owners idea, select designers, develop building concept, feasibility, engineering team, documents, buildings official review, contractor selection Selection Considerations for Building Materials ️️Suitability, availability, cost, appearance and preference What are building constraints? ️️Physical limitations (land, soil, structural plan), budget, legal restrictions Who has primary responsibility for building material selection? ️️Designer/arc with input from the owner for appearance and contractor for cost Who is primarily responsible for construction methods? ️️The contractor. The contractor is responsible because they should be the most knowledgeable, control the site operations, and understand how method/means affect price and time. To avoid problems follow project specifications and manufactures instructions/recommendations What is a zoning ordinance? ️️Imposed by local authorities (City, Council, State) which typically govern the property use (It's function), size setbacks and appearance (height, % of land used, distance of property lines, signage, lighting, landscaping and exterior appearance), access and parking (street access, # and how, parking requirements), and construction activities (noise and work hours). What are the purpose of building codes? ️️To establish minimum construction for the protection of life, health and welfare of the public. What is the primary focus of building codes? ️️To protect against fire. What does IBC stand for? ️️International Building Codes What does SBC stand for and where is it used? ️️Standard building code and is used in south and south east for winds/hurricane. How many jurisdictions are there in US regulating buildings? ️️There are more than 44,000 jurisdictions. What is the average time required to issue permit issues? ️️52 days for residential & 81 days for commercial How is the fire resistance rating measured? What correlation is there between the fire resistance rating and cost? ️️It is measured in hours and the more resistant, the higher the cost. Therefore often build to the lowest acceptable rating to be competitive. Who pays for tests to rate materials and assemblies for fire resistance? ️️Building materials manufacturer & construction trade organizations. What does ASTM stand for and what do they do? ️️American Society for Testing and Materials, establish testing standards What does CSI stand for? ️️Construction Specifications Institute How is a building system chosen? ️️It is chosen based on required function, performance, desired aesthetics, legally possible, most economical What is sustainability? ️️Meeting the needs of the present generation without compromising the ability of future generations to meet their needs. What is green building? ️️Buidling that does the following: energy efficient, efficient land use, renewable products/materials, protect soil What does LEED stand for? ️️Leadership in energy and environmental design What is LEED used for? ️️A system for evaluating the sustainability of a buildings design What are design and performance issues? ️️This is evaluated on every building, visual functional technical and legal considerations. Examples of issues are: Function, aesthetics, durability, life, expansion/contraction, heat flow, maintenance, market attracting, fire safety, initial cost, life cycle cost. Trade offs must be made correctly between Time, Cost and Quality in order to not have issues. What are construction issues? ️️Deal with actual construction, relate to means and methods such as: safety, schedule, cost, quality, optimum use of trades, weather, activity, sequencing, productivity. Owners Idea ️️First step in the building process: Driven by need or opportunity (home to large plant) Select Design Professionals ️️Second step in the building process: The architect or construction manager first. Then structural engineer and geotechnical etc Develop Building Concept ️️Third step in the building process: putting the owner's ideas on paper. Dealing with the building function, appearance, "Siteing" The building, Access, budgets, building systems and materials. Feasibility Study ️️Fourth step in the building process: Is the project feasible for the site, economically, finance or public (support)? Assemble Design & Engineering Team ️️Fifth step in the building process: Depending on the project acquire an engineering team featuring: structural, civil, MPE, landscape, interior design, sound lighting. Develop Contract Documents ️️The sixth step in the building process: Complete transfer of idea to paper, documenting of project scope for understanding by all parties, and the pricing and construction. Building Officials Compliance Review ️️The seventh step in the building process: often more than one visit, goes over codes, zoning, fire safety, legal, regulati

Content preview

Chapter 1 Construction Methods and Materials Verified A+
The Building Process From Idea to Reality ✔️✔️Owners idea, select designers, develop building
concept, feasibility, engineering team, documents, buildings official review, contractor selection



Selection Considerations for Building Materials ✔️✔️Suitability, availability, cost, appearance and
preference



What are building constraints? ✔️✔️Physical limitations (land, soil, structural plan), budget, legal
restrictions



Who has primary responsibility for building material selection? ✔️✔️Designer/arc with input from the
owner for appearance and contractor for cost



Who is primarily responsible for construction methods? ✔️✔️The contractor. The contractor is
responsible because they should be the most knowledgeable, control the site operations, and
understand how method/means affect price and time. To avoid problems follow project specifications
and manufactures instructions/recommendations



What is a zoning ordinance? ✔️✔️Imposed by local authorities (City, Council, State) which typically
govern the property use (It's function), size setbacks and appearance (height, % of land used, distance of
property lines, signage, lighting, landscaping and exterior appearance), access and parking (street
access, # and how, parking requirements), and construction activities (noise and work hours).



What are the purpose of building codes? ✔️✔️To establish minimum construction for the protection
of life, health and welfare of the public.



What is the primary focus of building codes? ✔️✔️To protect against fire.



What does IBC stand for? ✔️✔️International Building Codes



What does SBC stand for and where is it used? ✔️✔️Standard building code and is used in south and
south east for winds/hurricane.

, How many jurisdictions are there in US regulating buildings? ✔️✔️There are more than 44,000
jurisdictions.



What is the average time required to issue permit issues? ✔️✔️52 days for residential & 81 days for
commercial



How is the fire resistance rating measured? What correlation is there between the fire resistance rating
and cost? ✔️✔️It is measured in hours and the more resistant, the higher the cost. Therefore often
build to the lowest acceptable rating to be competitive.



Who pays for tests to rate materials and assemblies for fire resistance? ✔️✔️Building materials
manufacturer & construction trade organizations.



What does ASTM stand for and what do they do? ✔️✔️American Society for Testing and Materials,
establish testing standards



What does CSI stand for? ✔️✔️Construction Specifications Institute



How is a building system chosen? ✔️✔️It is chosen based on required function, performance, desired
aesthetics, legally possible, most economical



What is sustainability? ✔️✔️Meeting the needs of the present generation without compromising the
ability of future generations to meet their needs.



What is green building? ✔️✔️Buidling that does the following: energy efficient, efficient land use,
renewable products/materials, protect soil



What does LEED stand for? ✔️✔️Leadership in energy and environmental design



What is LEED used for? ✔️✔️A system for evaluating the sustainability of a buildings design

Document information

Uploaded on
October 26, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CertifiedGrades
3.9
(38)
Sold
149
Followers
61
Items
8729
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions