• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

IMSA Workzone

Document preview thumbnail
Preview 2 out of 11 pages

Exam of 11 pages for the course IMSA Workzone at IMSA Workzone (IMSA Workzone)

Content preview

IMSA WORKZONE QUESTIONS AND
100% CORRECT VERIFIED ANSWERS
/GRADE A

o On the shoulder adjacent to traffic being controlled - The work zone starts at the first advance warning
sign; therefore, where should the flagger stand when directing traffic in a TTC zone?



three - How many orange and black TTC signs should there be in each direction on a 2-way, 2-lane rural
roadway?



500 ft. - What should the sign spacing be on a two-lane, two-way rural highway?



350 ft - How many feet apart should the advanced warning signs be on a high speed urban roadway?



on the left hand side of the highway - For additional emphasis on a high speed urban roadway, signs may
be posted: _________



The distance required to safely route traffic from one lane to another - Taper length refers to:



speed and width of lane closed - taper length is based on:



equal in feet to the speed limit - in a taper, the maximum distance between channelizing devices should
be:



traffic should pass to the left - on a barricade, if the stripes start at the upper right side and angle down
to the lower left side: ________



at least 28" tall and retroreflectorized with at least two white bands and two orange bands - at night
and/or on high speed roads greater than 45 mph, cones shall be: __________

, at the beginning of the taper - one a rural two-lane road, where would you place the flagger in respect to
the beginning of the taper for a closed lane?



1) Type of work to be done

2) traffic volume

3) traffic speed

4) school bus routes - What are some factors that should be considered in formulating a TTC plan?



diversion - the rerouting of traffic onto a temporary bypass road is known as a: __________



removed by grinding - pavement markings no longer needed should be:



routinely - a TTC zone should be checked:



Standard Statement - in the MUTCD a mandatory condition is a:



a statement of a permissive condition - in the mutcd an option is:



temporary traffic control plan - A TTC plan is a:



typical application drawings - A TTC plan should include:



be trained and/or certified - The MUTCD states that individuals responsible for the implementation of
TTC measures should:



1) traffic safety, movement, and guidance

2) TTC zone inspection

3) TTC zone maintenance - TTC principles and procedures should include:

Document information

Uploaded on
October 24, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
edunurse
3.6
(19)
Sold
153
Followers
13
Items
6803
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions