• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

DBIA Exam Questions and Correct Answers

Document preview thumbnail
Preview 1 out of 2 pages

Clinger Cohen Act 1996 Defense Procurement Reform Act - ANSWER-Allows all Miller Act 1935 - ANSWER-Federal Government passed bond adopting a Miller right requiring Qualifications Based Brooks Act 1972 - ANSWER-A/E's selected on qualifications payment and performance bonds on all public works. federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Standard of Care - ANSWER-The level of quality that any average Design Professional would be able to perform given the circumstances

Content preview

DBIA Exam Questions and Correct Answers
Miller Act 1935 - ANSWER-Federal Government passed bond adopting a Miller right
requiring payment and performance bonds on all public works.

Qualifications Based Brooks Act 1972 - ANSWER-A/E's selected on qualifications

Clinger Cohen Act 1996 Defense Procurement Reform Act - ANSWER-Allows all
federal agencies to utilize Design-Build. Prior to that no enabling legislation existed
allowing Design-Build.

Standard of Care - ANSWER-The level of quality that any average Design Professional
would be able to perform given the circumstances.

Design Bid Build - ANSWER-Slowest Project Delivery method, linear in nature,
prescriptive (owner knows what they want),

Multi Prime - ANSWER-Project Delivery

CM at Risk - ANSWER-Project Delivery method allowing the contractor to come on
board very early in design for preconstruction services yet maintains separation
between Designer and Builder contractually.

Design Build - ANSWER-Fastest Project Delivery method, fast tracking possible
overlapping design with construction utilizing incremental packages.

Low Bid - ANSWER-Procurement Method

Negotiated (Qualifications Based) - ANSWER-Procurement Method

Best Value - ANSWER-Procurement Method

Sole Source - ANSWER-Procurement Method

Lump Sum - ANSWER-Contract Format typically in DBB

Cost Plus Fee - ANSWER-Contract Format

GMP (Guaranteed Maximum Price) - ANSWER-Contract Format

Unit Price - ANSWER-Contract Format

Target Price - ANSWER-Contract Format

Trust flexibility - ANSWER-Successful Design Build requires _____ & _______ between
participants

Document information

Uploaded on
October 23, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shiifridoc
5.0
(3)
Sold
9
Followers
7
Items
1905
Last sold
8 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions