Nicet Level 1 Fire Alarm Inspection &
Testing Exam
Verification of performance of inspection and testing programs shall do
which of the following to - -Verify that the installed system meets the
operation requirements of the version of code when the system was
installed, verify the correct operation of the system.
-Which of the following shall be done when conducting tests in lead-acid
type batteries - -Annually conduct a discharge test with the charger
disconnected while conducting a load test with full alarm load or an artificial
load,
-Area of refuge two-way communication systems are required to be tested
in which of the following three ways - -Verify Receipt of visual and audible
signal at the transmitting and receiving unit, respectively
-How often shall secondary power supply be tested? - -Annually
-How often are video image smoke and fire detectors required to be
inspected? - -Annually
-Which two of the following are true regarding acceptable test plans? - -
Shall be documented with the testing records, shall be written to clearly
establish the scope of the testing for the fire alarm or signaling system.
-How often shall fire optic cable connections be inspected? - -Annually
-How many years after the initial installation shall all fixed temperature non
restorable line type detectors be replaced or have 2 per 100 laboratory
tested? - -20 Years
-How often are digital alarm communicator transmitters required to be
inspected? - -Annually
-How are rate of rise heat detectors tested? - -Heat gun or something
similar
-What must be done when using a multimeter to measure current? - -Put
the meter in series with the circuit (Pulling negative wire and replacing it
with voltmeter to read current)
Testing Exam
Verification of performance of inspection and testing programs shall do
which of the following to - -Verify that the installed system meets the
operation requirements of the version of code when the system was
installed, verify the correct operation of the system.
-Which of the following shall be done when conducting tests in lead-acid
type batteries - -Annually conduct a discharge test with the charger
disconnected while conducting a load test with full alarm load or an artificial
load,
-Area of refuge two-way communication systems are required to be tested
in which of the following three ways - -Verify Receipt of visual and audible
signal at the transmitting and receiving unit, respectively
-How often shall secondary power supply be tested? - -Annually
-How often are video image smoke and fire detectors required to be
inspected? - -Annually
-Which two of the following are true regarding acceptable test plans? - -
Shall be documented with the testing records, shall be written to clearly
establish the scope of the testing for the fire alarm or signaling system.
-How often shall fire optic cable connections be inspected? - -Annually
-How many years after the initial installation shall all fixed temperature non
restorable line type detectors be replaced or have 2 per 100 laboratory
tested? - -20 Years
-How often are digital alarm communicator transmitters required to be
inspected? - -Annually
-How are rate of rise heat detectors tested? - -Heat gun or something
similar
-What must be done when using a multimeter to measure current? - -Put
the meter in series with the circuit (Pulling negative wire and replacing it
with voltmeter to read current)