The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - ANSWER2% The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWERA. 75% When the number of layers of rope on a drum increase the line pull___________. - ANSWERDecreases When handling boom sections, the best place for slings to be attached is; - ANSWERAt the pin connections at the ends of the top chords Placing timber blocking under the tips of the tracks on a crawler crane will; - ANSWERMake the crane more stable The most unstable working quadrant for a crawler crane is the; - ANSWERSide What type of capacity is listed on a crane load chart? - ANSWERStatic If the manufacture of a particular crane does not specifically permit pick and carry operations what procedure must be followed during this operation? - ANSWERDon't make any pick and carry lifts

Content preview

NCCCO Lattice Boom General Knowledge Correct
Questions & Answers(RATED A+)


The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus
a direct side load equal to what percent of the rated load? - ANSWER2%



The part of the load chart governed by stability is based on what percentage of capacity while a
crawler crane is working over the side quadrant? - ANSWERA. 75%



When the number of layers of rope on a drum increase the line pull___________. -
ANSWERDecreases



When handling boom sections, the best place for slings to be attached is; - ANSWERAt the pin
connections at the ends of the top chords



Placing timber blocking under the tips of the tracks on a crawler crane will; - ANSWERMake the crane
more stable



The most unstable working quadrant for a crawler crane is the; - ANSWERSide



What type of capacity is listed on a crane load chart? - ANSWERStatic



If the manufacture of a particular crane does not specifically permit pick and carry operations what
procedure must be followed during this operation? - ANSWERDon't make any pick and carry lifts



What is the main purpose of a jib/extension? - ANSWERTo extend reach higher or up and over



What is the major effect of stopping suddenly a rapid swing while operating long boom crane? -
ANSWERAction may cause the crane boom collapse and/or overturn the crane

, According to B30.10 hooks shall be removed from service when the throat opening exceeds _____
the original throat opening. - ANSWER5%



On a crawler crane ground bearing pressure is greatest where? - ANSWEROver the corner



During disassembly of a long boom, the pendant lines are connected at the maximum cantilever
point and the boom is slightly lifted off the ground, which boom connection pins are to be removed
next? - ANSWERThe bottom pins ahead of the cantilever point



According to ASME B30.5 a fire extinguisher shall have a rating of __________ and shall be available
at all operator's stations or cabs of the equipment. - ANSWER10 BC or higher



When assembling a lattice boom crane the top pins of the boom sections should be inserted; -
ANSWERFirst



Block hoisting sheaves should have a minimum pitch diameter of at least________ the rope
diameter. - ANSWER16 times



Most crane manufactures require the load chart capacities must be reduced when wind speed
reaches; - ANSWER20 mph



The definition of cantilever of a lattice boom crane is; - ANSWERThe boom suspended past the
pendant connections



What chart do you use when operating a crane on a barge; - ANSWERList chart



According to OSHA, Jibs must have a positive ________ from backwards overturning - ANSWERStop



Mobile cranes on barges shall be - ANSWERPhysically attached to the barge



When a crane is properly barricaded, what is the clearance required all the way around 360 degrees
between the superstructure and the barricade when swung 360 degrees? - ANSWER2 feet

Document information

Uploaded on
October 16, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol
3.8
(79)
Sold
451
Followers
254
Items
14160
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions