Collecting a representative sample of concrete to be tested is as important as executing the test methods to obtain - answer-Accurate results This practice covers sampling from four types of equipment, which are ___________, ___________, __________, and __________. - answer-stationary mixers, paving mixers, revolving truck mixers, continuous mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed - answer-15 min Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - answer-True, need to recombine Start the tests for slump, temp, and air content within ______ after obtaining the final portion of the composite sample? - answer-5 min Start molding specimens for strength tests within ______ after fabricating the composite sample? - answer-15 min The concrete sample must be protected from contamination and - answer-Evaporation The minimum size sample for making strength test specimens is - answer-1 cf When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - answer-2 When sampling from a paving mixer, obtain samples from at least ______ different portions of the pile and combine them into one composite sample for test purposes. - answer-5 When sampling from a revolving drum truck mixer, sample the concrete by collecting _____ or more portions taken at regularly spaced intervals during discharge of the middle portion of this batch. - answer-2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - answer-False When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ _____ before making the test. - answer-Wet Screened The stem of the thermometer is submerged a minimum of ______ into the freshly mixed concrete. - answer-3 in The thermometer shall be capable of accurately measuring the temperature of freshly mixed concrete to ______ throughout a range of ______. - answer-+/- 1 F, 30-120 F The thermometer shall be verified within ______ - answer-at least 1 year of current use The temperature of concrete may be measured in a wheelbarrow. True or False? - answer-True The temperature of concrete may be measured in a wall form. True or False? - answer-True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False? - answer-False What must be done to the sample container prior to sampling the concrete? - answer-Dampened What must be done to the concrete surrounding the thermometer after the device is submerged in the fresh concrete? - answer-Push concrete around the steam to ensure the concrete is in full contact with the stem. How long must the thermometer remain in the freshly mixed concrete? - answer-2-5 min After the temp of the concrete is read, what is then required? - answer-Record temp The temperature of the concrete is recorded to the nearest - answer-full degree There is a specified maximum temp of freshly mixed concrete. True or False? - answer-False The sample of concrete used for temp determination must be rodded 25 times. True or False? - answer-False When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____. - answer-Wet screened through 1-1/2 in sieve The mold for making the slump test is in the shape of _____. - answer-Frustum of a cone The height of the slump mold is - answer-12 in The interior surface of the slump mold is allowed to have minor irregularities. True or False? - answer-False For use in the slump test, the end or both ends of the tamping rod must be _____. - answer-Rounded to a hemispherical tip The slump mold should be in a dry condition before beginning the test. True or False? - answer-False, needs to be dampened The surface on which the slump mold will be placed must be - answer-Flat, level, dampened, and rigid The slump mold is filled in _____ layers. - answer-3 Each layer should fill approximately _____ the volume of the mold. - answer-1/3 Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. - answer-25 How deep should the tamping rod penetrate into each layer? - answer-Rod each layer throughout its depth; on the second and third rod should penetrate previous 1 in What must be done if the concrete drops below the top of the slump mold while the top layer is being rodded? - answer-Stop, add more concrete, continue rodding at stopped number Prior to lifting the mold, concrete must be removed from _____. - answer-bottom of the mold, to create a clean surface After the final rodding, the sides of the slump mold should should be tapped lightly with the tamping rod. True or False? - answer-False When raising the slump mold, it should not be rotated or twisted, True or False? - answer-True, vertical How much time is allowed for lifting the slump mold? - answer-5 sec +/- 2 sec The measurement for slump is made from the top of the mold to what point of the concrete specimen? - answer-To the original displaced center of the top surface The slump of the concrete is measured and reported to the nearest - answer-1/4 in How much time is allowed to conduct the slump test from beginning to completion? - answer-2 1/2 min The length of the tamping rod used in this test method is (UW) - answer-at least 4 in more than the measure but no more than 24 in overall length What is the required shape of the tamping end of the rod - answer-Rounded to hemispherical tip What is the required minimum frequency of the vibrator used in this test method? (UW) - answer-9000 VPM The outside diameter or side dimension of the vibrating element must be at least _____ but not greater than _____. - answer-.75 in, 1.5 in What material is the measure made of? - answer-Typically metal What is the minimum thickness of a metal strike-off plate? - answer-1/4 in What is the minimum thickness of a glass or acrylic strike off plate? - answer-1/2 in What is the specified weight of the mallet used on measures that are 1/2 cf or sm

Content preview

ACI STUDY QUESTIONS AND ANSWER
Collecting a representative sample of concrete to be tested is as important as
executing the test methods to obtain - answer-Accurate results

This practice covers sampling from four types of equipment, which are ___________,
___________, __________, and __________. - answer-stationary mixers, paving mixers,
revolving truck mixers, continuous mixers

The elapsed time between obtaining the first and final portions of a composite
sample shall not exceed - answer-15 min

Portions of a composite sample shall be thoroughly remixed bfore beginning tests
on the sample. True of False? - answer-True, need to recombine

Start the tests for slump, temp, and air content within ______ after obtaining the
final portion of the composite sample? - answer-5 min

Start molding specimens for strength tests within ______ after fabricating the
composite sample? - answer-15 min

The concrete sample must be protected from contamination and - answer-
Evaporation

The minimum size sample for making strength test specimens is - answer-1 cf

When sampling from a stationary mixer, the batch must be sampled at _____ or
more regularly spaced intervals during discharge of the middle portion of the batch
- answer-2

When sampling from a paving mixer, obtain samples from at least ______ different
portions of the pile and combine them into one composite sample for test purposes.
- answer-5

When sampling from a revolving drum truck mixer, sample the concrete by
collecting _____ or more portions taken at regularly spaced intervals during
discharge of the middle portion of this batch. - answer-2

Concrete samples from a truck mixer must be obtained before any water or
admixtures are added to the mixer at the job site. True or False? - answer-False

When the concrete contains aggregate larger than that permitted for a particular
test method, the sample of concrete must be _____ _____ before making the test. -
answer-Wet Screened

The stem of the thermometer is submerged a minimum of ______ into the freshly
mixed concrete. - answer-3 in

, The thermometer shall be capable of accurately measuring the temperature of
freshly mixed concrete to ______ throughout a range of ______. - answer-+/- 1 F, 30-
120 F

The thermometer shall be verified within ______ - answer-at least 1 year of current
use

The temperature of concrete may be measured in a wheelbarrow. True or False? -
answer-True

The temperature of concrete may be measured in a wall form. True or False? -
answer-True

A composite sample of concrete is required even if the only purpose for obtaining
the sample is to determine temperature. True or False? - answer-False

What must be done to the sample container prior to sampling the concrete? -
answer-Dampened

What must be done to the concrete surrounding the thermometer after the device is
submerged in the fresh concrete? - answer-Push concrete around the steam to
ensure the concrete is in full contact with the stem.

How long must the thermometer remain in the freshly mixed concrete? - answer-2-5
min

After the temp of the concrete is read, what is then required? - answer-Record temp

The temperature of the concrete is recorded to the nearest - answer-full degree

There is a specified maximum temp of freshly mixed concrete. True or False? -
answer-False

The sample of concrete used for temp determination must be rodded 25 times. True
or False? - answer-False

When the concrete contains aggregate larger than allowed for the slump test, the
large aggregate must be _____. - answer-Wet screened through 1-1/2 in sieve

The mold for making the slump test is in the shape of _____. - answer-Frustum of a
cone

The height of the slump mold is - answer-12 in

The interior surface of the slump mold is allowed to have minor irregularities. True
or False? - answer-False

For use in the slump test, the end or both ends of the tamping rod must be _____. -
answer-Rounded to a hemispherical tip

Document information

Uploaded on
October 16, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TOPDOCTOR
5.0
(1)
Sold
10
Followers
5
Items
3387
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions