Before leveling a mobile crane on outriggers, an operator should ensure: - answer-there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - answer-Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - answer-Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service? - answer-6 On a mobile crane, how many broken wires are permitted at the end connection of a pendent before it must be taken out of service? - answer-1 Type 1 rotation resistant hoist wire rope has a design factor of: - answer-5 to 1 How many randomly distributed broken wires in rotation- resistant hoist wire rope are considered for replacement? - answer-2 broken wires in 6 rope diameters The term net capacity is best defined by which of the terms listed below? - answer-Gross capacity minus capacity deductions Mobile cranes that are set up on barges, shall have a list chart provided by which of the entities listed below? - answer-Manufacturer When lifting loads on tires, mobile cranes are rated at what percentage of tipping? - answer-75% How does the effective weight of a slowed extension relate to the actual weight of the extension? - answer-Higher than the actual weight. When load radius is between radii values, the operator must use the: - answer-longer radius Why should only approved attachments or extra counterweights provided by the manufacturer be placed on the rear of the crane? - answer-They could cause a backward stability problem. A mobile crane's jib is offset 15º versus its original 0º offset, but the boom angle remains unchanged. In this situation, the load radius: - answer-increases Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect? - answer-Collapsing the boom. When determining the position to a mobile crane should be left in over night, when high winds in the forecast the operator should: - answer-Follow the manufacturers recommendations. If a mobile crane is NOT set-up level and the operator swings the load from the high side to the low side, what effect will that have on the radius? - answer-The radius increase. Increasing the distance from the crane's center of gravity to the tipping axis will have what effect on the mobile crane? - answer-Decreases stability. Backward stability of a mobile crane is tested in which configuration listed below? - answer-Basic boom at minimum angle with no load Deflection of the boom while operating a mobile crane will increase? - answer-Load Radius (Swings out) A sudden start or stop of the hoisting function while operating a mobile crane can produce a: - answer-dynamic load Before lifting an occupied personnel platform on a job site, which of the following applies? - answer-Use 50% of rated capacity, Trial lift to anticipated weight, Ensure rigging dedicated to platform only. According to OSHA 1926. 1431, while hoisting a personnel platform, what weather condition listed below will promptly discontinue the operation? - answer-Dangerous If working near overhead power line and using a tag line, which type of rope is least conductive to electricity? - answer-Polypropylene When working near power lines with the mobile crane, where does OSHA require caution stickers be installed on all equipment? - answer-At operators station and 2 on the outside of the equipment. According to OSHA table T, what is the minimum clearance for 133kV power lines? - answer-10ft According to OSHA's table T, what clearance should a mobile crane IN TRANSIT keep while going under 445kV lines? - answer-16ft According to OSHA when is it safe to hoist loads with a mobile crane below energized power lines? - answer-When the fully extended boom can't reach the prohibited zone. According to OSHA 1926. 1411, when you encounter power lines with a voltage of 44kV and the crane is TRAVELING, according to Table T, what is the minimum required clearance? - answer-6ft According to OSHA, mobile crane load block hooks must not have a twist in excess of: - answer-0 According to OSHA, mobile crane load blocks hooks must not have a throat opening in excess of: - answer-5% When correctly installing U-bolt type wire rope clips, the U portion of the clip shall be on: - answer-the dead or short end What is the angle between the top of the load and the sling leg referred to in sling load charts? - answer-Horizontal sling angle When installing a wedge socket, it must be attached with the load line pulling in a straight line from the: - answer-pin What is the purpose of placing mats or cribbing under outrigger floats? - answer-Distribute the force over a larger area Where is the best location for leveling a crane? - answer-Upperworks When may blocking (cribbing) be placed under outrigger beams on mobile cranes? - answer-Never approved Mobile cranes should be level to within what percent of grade? - answer-1%

Content preview

NCCCO CORE EXAM
Before leveling a mobile crane on outriggers, an operator should ensure: - answer-there is no weight of
the crane bearing on any tires

Operating a mobile crane with a long boom, on uneven ground, what support condition should be
considered? - answer-Keeping 90 degree angle between cylinder rod and pad

What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - answer-Separate the
boom hoist lines

How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it
should be removed from service? - answer-6

On a mobile crane, how many broken wires are permitted at the end connection of a pendent before it
must be taken out of service? - answer-1

Type 1 rotation resistant hoist wire rope has a design factor of: - answer-5 to 1

How many randomly distributed broken wires in rotation- resistant hoist wire rope are considered for
replacement? - answer-2 broken wires in 6 rope diameters

The term net capacity is best defined by which of the terms listed below? - answer-Gross capacity minus
capacity deductions

Mobile cranes that are set up on barges, shall have a list chart provided by which of the entities listed
below? - answer-Manufacturer

When lifting loads on tires, mobile cranes are rated at what percentage of tipping? - answer-75%

How does the effective weight of a slowed extension relate to the actual weight of the extension? -
answer-Higher than the actual weight.

When load radius is between radii values, the operator must use the: - answer-longer radius

Why should only approved attachments or extra counterweights provided by the manufacturer be
placed on the rear of the crane? - answer-They could cause a backward stability problem.

A mobile crane's jib is offset 15º versus its original 0º offset, but the boom angle remains unchanged. In
this situation, the load radius: - answer-increases

Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect? - answer-
Collapsing the boom.

When determining the position to a mobile crane should be left in over night, when high winds in the
forecast the operator should: - answer-Follow the manufacturers recommendations.

, If a mobile crane is NOT set-up level and the operator swings the load from the high side to the low side,
what effect will that have on the radius? - answer-The radius increase.

Increasing the distance from the crane's center of gravity to the tipping axis will have what effect on the
mobile crane? - answer-Decreases stability.

Backward stability of a mobile crane is tested in which configuration listed below? - answer-Basic boom
at minimum angle with no load

Deflection of the boom while operating a mobile crane will increase? - answer-Load Radius (Swings out)

A sudden start or stop of the hoisting function while operating a mobile crane can produce a: - answer-
dynamic load

Before lifting an occupied personnel platform on a job site, which of the following applies? - answer-Use
50% of rated capacity, Trial lift to anticipated weight, Ensure rigging dedicated to platform only.

According to OSHA 1926. 1431, while hoisting a personnel platform, what weather condition listed
below will promptly discontinue the operation? - answer-Dangerous

If working near overhead power line and using a tag line, which type of rope is least conductive to
electricity? - answer-Polypropylene

When working near power lines with the mobile crane, where does OSHA require caution stickers be
installed on all equipment? - answer-At operators station and 2 on the outside of the equipment.

According to OSHA table T, what is the minimum clearance for 133kV power lines? - answer-10ft

According to OSHA's table T, what clearance should a mobile crane IN TRANSIT keep while going under
445kV lines? - answer-16ft

According to OSHA when is it safe to hoist loads with a mobile crane below energized power lines? -
answer-When the fully extended boom can't reach the prohibited zone.

According to OSHA 1926. 1411, when you encounter power lines with a voltage of 44kV and the crane is
TRAVELING, according to Table T, what is the minimum required clearance? - answer-6ft

According to OSHA, mobile crane load block hooks must not have a twist in excess of: - answer-0

According to OSHA, mobile crane load blocks hooks must not have a throat opening in excess of: -
answer-5%

When correctly installing U-bolt type wire rope clips, the U portion of the clip shall be on: - answer-the
dead or short end

What is the angle between the top of the load and the sling leg referred to in sling load charts? - answer-
Horizontal sling angle

Document information

Uploaded on
October 15, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TOPDOCTOR
5.0
(1)
Sold
10
Followers
5
Items
3387
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions