• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

DBIA – Chapters Study Guide

Document preview thumbnail
Preview 2 out of 6 pages

DBIA – Chapters Study Guide Federal Acquisition Regulations (FAR) - Answer-1997 regulations changed allowing design build procurement Florida Law 1997 - Answer-QBS could be used in Design Build Construction Management Association of American - Answer-Formed 1982, Provided a service not a delivery method, they held no liability and it added a third contract. CM at Risk Disadvantages - Answer-2 Contracts, 2 Conflicting Agendas leading to change orders CM at Risk Advantages - Answer-Early GC involvement = cost info earlier to prevent budget overruns. Drives to a better schedule to mitigate selections and procurement schedule. Design and construction overlap. Good for complex phasing and schedule constraints. Allows for Value Engineering. CM as Agent/Advisor - Answer-Add on Services, No liability, can be used in any delivery method "At-Risk" in CM at Risk - Answer-Liable for construction cost, quality and schedule as well precon advice. NOT LIABLE FOR DESIGN. Disadvantages of Design Bid Build - Answer-Owner carries all risk, No engagement b/t architect or contractor allowing no creativity or innovation leaving VE as an afterthought. Advantages of Design Bid Build - Answer-Familiar, Suited for "lowest price" competitive bidding, No legislation hurdles, Owner highly involved in design. DBIA began - Answer-1993 by Haskell EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 2/6 CMAA, 1982 - Answer-Construction Management Association of American First DBIA Public Project - Answer-School project in Indiana 1968 American Institute of Constructors (AIC) - Answer-1971 formed for professional certification for a constructor. Kansas City Hyatt Regency Collapse - Answer-Deadly structural collapse, increased insurance premiums for errors and omissions insurance and general liability insurance. Shifted risk to subs after this. Professional CM - Answer-Independent entity that manages design and construction process acting as an agent or advisor to the owner. The may manage multiple prime contracts and provide preconstruction services. CURT - Answer-Created in 2000 to help create competitive advantage for construction users in the marketplace. Lean Construction - Answer-Projects should be managed as a whole process instead of a collection of independent elements and activities. A Procedure for Managing Production. Relational Contracting - Answer-Focuses on the relationship of the contract and the products and services (transactional) aspects of the contract. Alliance Contracting - Answer-Similar to relational contracting. Cooperative model that aligns values, goals and objectives between owners, designers and contractors. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 3/6 How faster delivery is achieved with Design Build: - Answer-Overlapping Design and Construction so project can start while still designing. Less RFIs by the time you reach the field as problems have been sorted out in design. Disadvantages of Design Build - Answer-Not typical = Steep Learning Curve, Owners must make decisions earlier, Restrictive procurement regulations. Best Value Procurement - Answer-Quantitative (Cost) and Qualitative (Past Performance, Design Solutions, Overall Management) How to measure project success typically: - Answer-Cost, Schedule, Quality How to measure project success in DB: - Answer-Number of Innovative Solutions Design Build Plus - Answer-When Owners "Add-On" Extra Services such as: project financing, project operations, maintenance and/or ownership. 3 Things to Consider before choosing a Project Delivery Method: - Answer-Goals of Project, Contraints/Limitations, Intangible Impacts. Project Goals - Answer-Budget, Schedule, Quality, Performance, Image, Appearance, Aesthetics, Function. Project Delivery Constraints - Answer-Zoning, Licensing Requirements, Owners in house capabilities and chain of command. Project Delivery Intangible Impacts - Answer-Corporate Culture, Personalities, Market Conditions, Union Influence, Risk/Decision Making Comfort. Important Characteristics to Design Build Delivery - Answer-1 - Solicitation/Basis of Award EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 4/6 2 - Team Approach 3 - DB Entity 4 - Risk Management 5 - Performance Requirements 6 - Who controls design details 7 - Design-Cost Relationship 8 - Integrated Design Build Scheduling 9 - Contracting Approach Design Entity - Order of Most Common - Answer-1 - Contractor Led 2 - Integrated 3 - Designer Led (most often engineering) 4 - Joint Venture or Developer Led Does the Spearin Doctrine apply in DB? - Answer-NO - Design Builder warrants plans and specifications, you cannot seek for errors and omissions insurance. Functional Requirements - Answer-BIG Picture to help develop performance requirements. Overall goals, constraints and challenges. Performance Criteria - Answer-Must be included w/ performance requirements so that you can determine if the project performs as intended. Examples: Written Standards, Field and Lab Tests, 3rd Party Calcs, On-site Mock-ups and Manufacturers Warranty. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 5/6 Two Stage Procurement - Answer-1 - Shortlist using QBS 2 - Choose off of Best Value Fixed Price/Best Design - Answer-Owner discloses project budget and then only evaluates the technical proposal using a criteria matrix. Standard Care of Warranties - Answer-Performance based standards obligate the DB to warranty the construction and design. Draw-Build - Answer-A Form of Bridging, 35% or more of design is complete. Price Based Solicitation. Progressive Design Build - Answer-Two part contract. Part A: QBS solicitation where designer designs 60-70% for a lu

Content preview

EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.




DBIA – Chapters Study Guide

Federal Acquisition Regulations (FAR) - Answer✔✔-1997 regulations changed allowing design build

procurement


Florida Law 1997 - Answer✔✔-QBS could be used in Design Build


Construction Management Association of American - Answer✔✔-Formed 1982, Provided a service not a

delivery method, they held no liability and it added a third contract.


CM at Risk Disadvantages - Answer✔✔-2 Contracts, 2 Conflicting Agendas leading to change orders


CM at Risk Advantages - Answer✔✔-Early GC involvement = cost info earlier to prevent budget overruns.

Drives to a better schedule to mitigate selections and procurement schedule. Design and construction

overlap. Good for complex phasing and schedule constraints. Allows for Value Engineering.


CM as Agent/Advisor - Answer✔✔-Add on Services, No liability, can be used in any delivery method


"At-Risk" in CM at Risk - Answer✔✔-Liable for construction cost, quality and schedule as well precon

advice. NOT LIABLE FOR DESIGN.


Disadvantages of Design Bid Build - Answer✔✔-Owner carries all risk, No engagement b/t architect or

contractor allowing no creativity or innovation leaving VE as an afterthought.


Advantages of Design Bid Build - Answer✔✔-Familiar, Suited for "lowest price" competitive bidding, No

legislation hurdles, Owner highly involved in design.


DBIA began - Answer✔✔-1993 by Haskell



Page 1/6

, EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.



CMAA, 1982 - Answer✔✔-Construction Management Association of American


First DBIA Public Project - Answer✔✔-School project in Indiana 1968


American Institute of Constructors (AIC) - Answer✔✔-1971 formed for professional certification for a

constructor.


Kansas City Hyatt Regency Collapse - Answer✔✔-Deadly structural collapse, increased insurance

premiums for errors and omissions insurance and general liability insurance. Shifted risk to subs after

this.


Professional CM - Answer✔✔-Independent entity that manages design and construction process acting

as an agent or advisor to the owner. The may manage multiple prime contracts and provide

preconstruction services.


CURT - Answer✔✔-Created in 2000 to help create competitive advantage for construction users in the

marketplace.


Lean Construction - Answer✔✔-Projects should be managed as a whole process instead of a collection of

independent elements and activities. A Procedure for Managing Production.


Relational Contracting - Answer✔✔-Focuses on the relationship of the contract and the products and

services (transactional) aspects of the contract.


Alliance Contracting - Answer✔✔-Similar to relational contracting. Cooperative model that aligns values,

goals and objectives between owners, designers and contractors.




Page 2/6

Document information

Uploaded on
October 15, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Emillect
3.0
(4)
Sold
34
Followers
2
Items
2999
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions