TEST BANK FOR Dennis, Wixom, RothSystems Analysis and Design, 8th Edition
TEST BANK FOR Dennis, Wixom, RothSystems Analysis and Design, 8th Edition-Chapter 1 – Systems Analysis and Design – Dennis / Wixom / Roth – page 1 Multiple Choice 1. The outcome of the analysis phase is the: a) Feasibility analysis document b) System proposal document c) System specification document d) System request document e) Business process document Ans: b Reference: Figure 1-3: Systems Development Life Cycle Phases Difficulty: easy 2. The outcome of the planning phase is the: a) Test plan b) System proposal document c) System specification document d) System request document e) Business process document Ans: d Reference: Figure 1-3: Systems Development Life Cycle Phases Difficulty: easy 3. The outcome of the design phase is the: a) Feasibility analysis document b) System proposal document c) System specification document d) System request document e) Business process document Ans: c Reference: Figure 1-3: Systems Development Life Cycle Phases Difficulty: easy 4. Another outcome of the planning phase is the: a) Feasibility analysis document b) Project plan c) System specification document d) System proposal document e) Business process document Ans: b Reference: Figure 1-3: Systems Development Life Cycle Phases Difficulty: easy 5. Which is NOT true for systems analysts? a) They create value for an organization b) They enable the organization to perform work better c) They do things and challenge the current way that an organization works d) They play a key role in information systems development projects e) They are the project sponsors for system proposals Ans: e Reference: Introduction Difficulty: medium 6. Which is NOT an attribute of a systems analyst? a) Understanding what to change b) Knowing how to change it c) Convincing others of the need to change d) Serving as a change agent e) Selecting which projects to approve Ans: e Reference: The Systems Analyst Difficulty: easy 7. Which of the following project roles would identify how technology can improve business processes? a) Systems analyst b) Business analyst c) Infrastructure analyst d) Change management analyst e) Requirements analyst Ans: a Reference: The System Analyst Difficulty: easy 8. Which of the following project roles would insure that the system conforms to information systems standards? a) Systems analyst b) Business analyst c) Infrastructure analyst d) Change management analyst e) Project manager Ans: a Reference: The System Analyst Difficulty: easy 9. Which of the following project roles would focus on stakeholder requirements? a) Systems analyst b) Business analyst c) Infrastructure analyst d) Change management analyst e) Requirements analyst Ans: e Reference: The System Analyst Difficulty: easy
Document information
- Uploaded on
- October 15, 2024
- File latest updated on
- October 15, 2024
- Number of pages
- 279
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers