EBC 2102: ENGINEERING SURVEY I (THEORY): 24 CONTACT HOURS




LECTURE SESSIONS
Session Three:
3.1 Session Objectives:

At the end of the lesson the students should be able to:-
 Explain chain survey procedure
 Carry out chain surveying around obstacles
 Adjust for Chain survey errors
3.2Explain chain survey procedure
3.2.1 Suitability of chain surveying

 The area of surveying is completely small.
 The ground is fairly small.
 The area is open

3.2.2Procedure of Chain surveying

 Reconnaissance survey
 Making of stations
 Preparation of reference sketches
 Running of a survey line
 Locate the position of building with reference to survey line




3.2.2.1Reconnaissance survey

It is always useful and often absolutely necessary for the survey to make a preliminary inspection of the area
before commencing his actual detailed survey, for the purpose of fixing the survey stations and forming a general

,plan for the network of the chain lines. Such preliminary inspection of the area is generally known as
reconnaissance or reconnoiter.

On arriving at the ground the surveyor should, therefore, walk over the entire area to examine the ground to decide
upon the best layout of the chain lines.

During reconnaissance, the surveyor should ensure that the survey stations are intervisible, there is no difficulty in
chaining and the angles of the chain triangle are not acute.

3.2.2.2Marking Stations

On completion of successful reconnaissance, the survey stations should mark in such a way that they easily
discover during the progress of the survey even after some time, if necessary, to revise a faulty work.

In soft ground, wooden pegs are driven, leaving a small portion projected above the ground.

In case of roads or hard surface ground, nails or spikes may be driven flush with the pavement.

3.2.2.3Reference sketches

A brief description of each survey station gives and reference sketches drawn in the field book.

The sketch, showing a least three measurements to permanent and definite points such as the gates, pillars, light
posts, corners of the building, etc. known as a reference or location sketch.

3.2.2.4Running survey lines

So on completion of preliminary work, the survey lines ar earn as detailed below

 The ranging is done between the end stations of the bare line.
 The chain stretched in the true alignment keeping one end of the chain at the starting station.
 As the arrow is fixed at the other end of the chain and the chain is kept laying on the ground.
 The surveyor walks along the chain line and takes offsets to the adjacent objects on the right side and left side
as the case may.
 The chainages on the chain line and the offsets record in the field book.

, So the process of chaining and offsetting is repeated until the end of the baseline is reached.
 Other lines are similarly completed.

3.2.2.5 Located the position of building with reference to survey lines

 The name or number of the chain line.
 Name or number of the survey station.
 The symbol denoting the station mark.
 The Direction of surveying off form or ending at the station

3.2.3 Chain survey framework
When the surveyor is on the field to begin surveying he should first carry out a reconnaissance ( pre
visit to asses practical issues on the field)
Among other things the surveyor should:
 Walk over the area to be surveyed to get the general view of the area.
 Draw the sketch of the area
 Make notes on the boundaries, obstacles likely to be encountered and other physical features
 Note the positions to lay lines particularly the longest line called the back bone
 Mark the stations with pegs or iron pins
Principles of selecting chain lines and marking stations

, As already mentioned the principles of survey require that the survey lines be arranged so that the area can be
plotted easily. To achieve these, the following factors are used:
 The survey lines should be as few as possible and such as to form a sound geometrical framework
 The triangles formed should be well conditioned i.e. the apex angles of the triangles should be
between 30▫ and 150▫
 There should be an adequate number of the check lines which should be ideally used as chain lines to pick
the data details.
 The offsets used should be kept as short as possible especially those to important features
 Lines to lie over the more level ground
 Lines along the roads with much traffic should be kept to one side
 Obstacles should be avoided when laying lines
 The chain lines to be kept close to the details


Lines used in the chain surveying




Offsets: These are lines which are at right angles to the chain lines to the detail (feature)

Chain lines are lines between the survey pints
Base line is the longest line on the lines framework
Check lines are chain lines which are positioned such that they can also be used check the survey accuracy at
the time of plotting
Tie lines are lines drawn at any angle from the chain line to the feature. The intersection of the tie lines

Document information

Uploaded on
October 14, 2024
Number of pages
32
Written in
2024/2025
Type
Class notes
Professor(s)
Dr. joseph kingoo
Contains
All classes
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JOHNSON22
3.0
(2)
Sold
16
Followers
10
Items
768
Last sold
1 year ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions