Dates & Time Lengths - UST Exam | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+
Dates & Time Lengths - UST Exam | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+ Under-dispenser containment was required for all UST systems by ___________. a.) December 31, 2003 b.) July 1, 1987 c.) January 1, 1984 d.) January 1, 2000 - Answer -a.) December 31, 2003CCR Title 23, Sec 2636(g)(C) According to California Law, UST systems installed after July 1, 2003, require a one-time ELD test to ensure that the tank is product tight... a.) If the tank is located within one (1) mile of a public drinking water well b.) If the tank is located within 1000 feet of a public drinking water well c.) Unless the tank is equipped with secondary containmentd.) In all cases - Answer -For ALL tanks before use (H&SC 25290.2 (I))d.) In all casesH&SC, Sec 25290.2(i) The following is true of secondary containment testing, EXCEPT: a.) Must be tested every 24 months b.) Must be tested every 36 months c.) Results must be submitted to the local agency within 30 days o
Document information
- Uploaded on
- October 13, 2024
- Number of pages
- 27
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers