• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Cco Practice Exam Questions And Answers Rated A+

Document preview thumbnail
Preview 2 out of 15 pages

When working on rubber, cranes are rated at what percentage of tipping: a) 70% b) 75% c) 80% d) 85% - CORRECT ANSWER-75% When a crane is working "on outriggers" the only time they should be less than fully extended is when: a) working alongside the highway and cannot block a lane b) you are handling light loads c) the main boom is being lifted d) there is a load chart for this operation - CORRECT ANSWER-there is a load chart for this operation A truck crane set up with the outriggers extended and set, and tires touching the ground, the operator should refer to what load chart: a) intermediate chart b) over the front chart c) on rubber chart d) 85% of the main chart - CORRECT ANSWER-on rubber chart Blocking paced under the ends of crawler tracks will: a) increase the crane's stability when operating over front or back b) increase the crane's stability when operating over side c) stop crane from traveling unexpectedly d)stop crane from sliding unexpectedly - CORRECT ANSWER-increase the crane's stability when operating over front or back What quadrant produces the least amount of ground pressure on a lattice crawler: a) corner b) side c) front d) rear - CORRECT ANSWER-side During assembly where should you attach slings to lift boom sections: a) to the top of main chords b) to the top end fittings c) 2 feet from end of section d) center of boom section - CORRECT ANSWER-to the top end fittings

Content preview

CCO PRACTICE EXAM QUESTIONS AND
ANSWERS RATED A+

When working on rubber, cranes are rated at what percentage of tipping:

a) 70%

b) 75%

c) 80%

d) 85% - CORRECT ANSWER-75%



When a crane is working "on outriggers" the only time they should be less than fully
extended is when:

a) working alongside the highway and cannot block a lane

b) you are handling light loads

c) the main boom is being lifted

d) there is a load chart for this operation - CORRECT ANSWER-there is a load chart for
this operation



A truck crane set up with the outriggers extended and set, and tires touching the
ground, the operator should refer to what load chart:

a) intermediate chart

b) over the front chart

c) on rubber chart

d) 85% of the main chart - CORRECT ANSWER-on rubber chart



Blocking paced under the ends of crawler tracks will:

a) increase the crane's stability when operating over front or back

b) increase the crane's stability when operating over side

c) stop crane from traveling unexpectedly

, d)stop crane from sliding unexpectedly - CORRECT ANSWER-increase the crane's
stability when operating over front or back



What quadrant produces the least amount of ground pressure on a lattice crawler:

a) corner

b) side

c) front

d) rear - CORRECT ANSWER-side



During assembly where should you attach slings to lift boom sections:

a) to the top of main chords

b) to the top end fittings

c) 2 feet from end of section

d) center of boom section - CORRECT ANSWER-to the top end fittings



When a lattice boom truck crane is set up on outriggers, the floats or pads should
always be:

a) large enough to support two times the applied load

b) with the tires firmly on the ground

c) secured to the outriggers

d) placed on the mats - CORRECT ANSWER-secured to the outriggers



A truck crane operating with outriggers fully extended and set, but does not have a front
outrigger, the operator should:

a) operate over the front with caution

b) refer to the manufacturer's working area diagram

c) block under the bumper to provide more stability

d) only operate over the front at a 50% reduction of the load chart - CORRECT
ANSWER-refer to the manufacturer's working area diagram

Document information

Uploaded on
October 12, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Vaster
5.0
(2)
Sold
5
Followers
1
Items
847
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions