Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 68 pages
Exam (elaborations)

NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. -

Document preview thumbnail
Preview 4 out of 68 pages

NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. - NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421 EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY GRADED A+. -

Content preview

NERC RC (2VERSIONS) EXAM 2024/2025 NEWEST!! COMPLETE ACTUAL 421
EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS ) ALREADY
GRADED A+. -




Common standard time period for station battery to handle outage of
AC power to chargers - ANSWER-8-12 hours


Time to restore data exchange redundancy when redundancy testing
by RC/TOP/BA deemed unsuccessful - ANSWER-2 hours


Transition period to backup control facility (fully functioning) -
ANSWER-2 hours


Annual testing of backup control facility must prove to be functional
for this long - ANSWER-2 hours


Every 2 years TO/TOP/DSP must provide how many hours of system
restoration training to field switching personnel - ANSWER-2 hours


Every 2 years GOP's with blackstart resources shall provide how
many hours of training to operating personnel responsible for startup
- ANSWER-2 hours


BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - ANSWER-90 minutes

,How often should BA calculate and record inadvertent interchange -
ANSWER-60 minutes/hourly


How often should BA provide MW-hour meter readings to adjacent
BA's - ANSWER-60 minutes/hourly


TLR procedure (identifying TLR level and actions to be implemented)
needs updating how often - ANSWER-60 minutes/hourly


Hourly ATC for next 48 hours calculated how often - ANSWER-60
minutes/hourly


During EEA2/3 the energy deficient entity needs to update the RC how
often until alert is terminated - ANSWER-60 minutes/hourly


DOE-417 (disturbance reporting) should be completed by when -
ANSWER-60 minutes


BA with loss of resources must submit RFI with start time no more
than how far beyond the resource loss - ANSWER-60 minutes


Sink BA should ensure interchange modifications are submitted how
soon after the modification - ANSWER-60 minutes


If unable to calculate ACE for this long, BA must notify RC - ANSWER-
30 minutes

,ACE cannot exceed BAAL for how long - ANSWER-30 minutes


If AVR, PSS, or other voltage control device status changes from
normal operation, GOP must notify TOP within how long of the
change (if it does not last longer than this, no reporting necessary) -
ANSWER-30 minutes


GOP must notify TOP of change in reactive capability how quick -
ANSWER-30 minutes


TOP should return from unknown operating state how quick -
ANSWER-30 minutes


IROL Tv should be less than or equal to... (system should be returned
to IROL within this time frame of exceeding) - ANSWER-30 minutes


RC completes RT assessments of SOL/IROL violations how often -
ANSWER-30 minutes


Once BA/TOP notifies RC of emergency conditions, RC has how long
to notify other BA/TOP's and neighboring RC's - ANSWER-30 minutes


Unplanned evacuation from BES control center facility is reportable
by BA/TOP/RC if it lasts longer than... - ANSWER-30 minutes

, Complete loss of communication (including backup) is reportable if it
lasts longer than... - ANSWER-30 minutes


Planned or unplanned telemetering & control equipment outages of
more than how many minutes but be reported - ANSWER-30 minutes


Default ramp rate for Western Interconnection interchange schedules
- ANSWER-20 minutes


When BA unable to calculate ACE > 30 minutes, they have how long
to report to RC - ANSWER-15 minutes


Default disturbance recovery period (time to return ACE to 0 following
a disturbance, DCS) - ANSWER-15 minutes


Congestion management requests in Eastern Interconnection from
one RC to another must be implemented how quickly - ANSWER-15
minutes


Voltage deviation of >/= 10% nominal is reportable after how long -
ANSWER-15 minutes


Uncontrollable loss of firm load for how long is reportable (previous
years peak demand >3000; >/+300mw - otherwise 200mw) - ANSWER-
15 minutes

Document information

Uploaded on
October 11, 2024
Number of pages
68
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$26.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nyagajoseph539
3.8
(54)
Sold
249
Followers
14
Items
10810
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions