WITH THE COMPLETE SOLUTIONS
C. bPull bSystem b- bcorrect banswer-The bconcept bof bthe bdownstream bprocess
bgoing bto bthe bupstream bprocess bto bpick bup bproduct bis bcalled: b
a. bJust bin btime b
b. bPush bsystem b
c. bPull bsystem
d. bvisual bfactory
a. bIncrease bthe bcapacity bof bthe bconstraining bworkstation b- bcorrect banswer-A
bmulti-step bmanufacturing bprocess' bcapacity bis blimited bby bone bif bits
bworkstations. bTo bincrease bthe bprocess' bcapacity, bthe bfactory bmust: b
a. bIncrease bthe bcapacity bof bthe bconstraining bworkstation
b. bIncrease bproduction bstarts b(work bput binto bthe bfirst boperation) b
c. bDecrease bthe butilization bof ball bworkstations bin bthe bprocess b