Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

NCCCO LATTICE BOOM GENERAL KNOWLEDGE EXAM 2024/2025

Document preview thumbnail
Preview 2 out of 8 pages

NCCCO LATTICE BOOM GENERAL KNOWLEDGE EXAM 2024/2025

Content preview

NCCCO LATTICE BOOM GENERAL
KNOWLEDGE EXAM 2024/2025


The lattice boom is designed to take winds of up to 20 mph. from the
side plus a full rated load, plus a direct side load equal to what percent of
the rated load? - Precise Answer ✔✔2%


The part of the load chart governed by stability is based on what
percentage of capacity while a crawler crane is working over the side
quadrant? - Precise Answer ✔✔A. 75%


The most unstable working quadrant for a crawler crane is the; - Precise
Answer ✔✔Side


What type of capacity is listed on a crane load chart? - Precise Answer
✔✔Static


If the manufacture of a particular crane does not specifically permit pick
and carry operations what procedure must be followed during this
operation? - Precise Answer ✔✔Don't make any pick and carry lifts


What is the main purpose of a jib/extension? - Precise Answer ✔✔To
extend reach higher or up and over

, When the number of layers of rope on a drum increase the line
pull___________. - Precise Answer ✔✔Decreases


When handling boom sections, the best place for slings to be attached is;
- Precise Answer ✔✔At the pin connections at the ends of the top
chords


Placing timber blocking under the tips of the tracks on a crawler crane
will; - Precise Answer ✔✔Make the crane more stable


What is the major effect of stopping suddenly a rapid swing while
operating long boom crane? - Precise Answer ✔✔Action may cause the
crane boom collapse and/or overturn the crane


According to B30.10 hooks shall be removed from service when the
throat opening exceeds _____ the original throat opening. - Precise
Answer ✔✔5%


On a crawler crane ground bearing pressure is greatest where? - Precise
Answer ✔✔Over the corner


During disassembly of a long boom, the pendant lines are connected at
the maximum cantilever point and the boom is slightly lifted off the
ground, which boom connection pins are to be removed next? - Precise
Answer ✔✔The bottom pins ahead of the cantilever point

Document information

Uploaded on
October 5, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RapidPassAcademy
4.1
(17)
Sold
82
Followers
44
Items
3325
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions