CMIT FINAL EXAM |200+ Questions
with 100% Correct Answers | Updated
& Verified 2023




A CM's Role and Responsibilities - -ANSWER--Governed
solely by the Owner/CM Agreement.

Basic Forms of CM - -ANSWER--Agency and at-risk. Key
differences exist.

Factors Contributing to CM's Initial Use - -ANSWER--Need
to reduce time and cost, increasing project funding costs,
changing role of contractors.

First Federal Agency to Use CM - -ANSWER--General
Services Administration.

Common Problems in CM Use by Federal Agencies - -
ANSWER--Funding restrictions, claims, change
conditions.

,Formation of CMAA - -ANSWER--Incorporated in 1982 to
grow and develop CM profession.

CMAA Construction Management Standards - -ANSWER-
-Guide to professional CM services.

Goals of CMAA - -ANSWER--Setting standards,
expanding understanding, advocating for CM.

Certification and Qualification as a CM - -ANSWER--
Certification in another profession does not automatically
qualify as a CM.

Certification as a CM - -ANSWER--Does not guarantee
'state of the art' knowledge and capability.

Recruiting and training in business - -ANSWER--False

Construction management susceptible to overselling - -
ANSWER--True

Failure to provide quality services - -ANSWER--False

Contracting for adequate fees - -ANSWER--True

Ethics of CM profession focus on client relationships - -
ANSWER--True

Reasons for project delivery variations - -ANSWER--D) All
of the above

,Traditional delivery system phases executed in - -
ANSWER--B) A linear sequence

Advantage of traditional delivery approach - -ANSWER--B)
Facility features are fully determined & specified.

Design-build and at-risk CM allow fast-track or phased
projects - -ANSWER--True

Contractual definition of CM known when - -ANSWER--D)
All of the above

In a CM-at-Risk arrangement, once construction begins,
the CM has no implied duties of loyalty and care to the
owner. - -ANSWER--True

The agency CM does not perform design or actual
construction work. - -ANSWER--True

Under the CM-at-Risk delivery method, the owner usually
deals with a hybrid of a construction manager and a
general contractor. - -ANSWER--True

Under a CM-at-risk contract, all of the following statements
are true: - -ANSWER--D) All of the above

In considering the differences between agency CM and
CM-at-Risk, which statement is NOT true? - -ANSWER--
D) In an agency CM role, the CM directly subcontracts all
trade contracts.

, The agency CM does not maintain a direct contractual
relationship with the trade or prime contractors. - -
ANSWER--False

Placing the CM in an agency role always transfers the risk
to the contractor. - -ANSWER--True

In an agency CM relationship, the CM has no vested
financial interest in the project. - -ANSWER--True

Under agency CM, agency is a relationship between
owner and CM as agent acting in the owner's interest. - -
ANSWER--True

Actual usage of a particular contract form for the
construction phase depends on: - -ANSWER--D) All of the
above

Two Basic Categories of Construction Phase Contracts - -
ANSWER--Cost Reimbursement and Fixed Price

Fixed Price Contract Bids - -ANSWER--Can be based on
partially completed documents or complete set of
drawings and specifications

Primary Advantage of Fixed Price Contract - -ANSWER--
Bids should be taken on contract documents that are fully
complete

Document information

Uploaded on
October 5, 2024
Number of pages
32
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
denismunene
3.5
(2)
Sold
10
Followers
2
Items
278
Last sold
8 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions