Dates & Time Lengths - UST Exam | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+
Dates & Time Lengths - UST Exam | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+ Under-dispenser containment was required for all UST systems by ___________. a.) December 31, 2003 b.) July 1, 1987 c.) January 1, 1984 d.) January 1, 2000 - Answer -a.) December 31, 2003CCR Title 23, Sec 2636(g)(C) According to California Law, UST systems installed after July 1, 2003, require a one-time ELD test to ensure that the tank is product tight... a.) If the tank is located within one (1) mile of a public drinking water well b.) If the tank is located within 1000 feet of a public drinking water well c.) Unless the tank is equipped with secondary containmentd.) In all cases - Answer -For ALL tanks before use (H&SC 25290.2 (I))d.) In all casesH&SC, Sec 25290.2(i) The following is true of secondary containment testing, EXCEPT: a.) Must be tested every 24 months b.) Must be tested every 36 months c.) Results must be submitted to the local agency within 30 days of testing d.) Local agency must be notified 48 hours prior to testing - Answer -a.) Must be tested every 24 months CCR Title 23, Sec 2637(a) Records of cathodic protection s
Document information
- Uploaded on
- October 3, 2024
- Number of pages
- 27
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers