Corrosion Specialist designs and certifies cathodic protection system
A. 100% of usable capacity of primary where there is only one primary is within the
Secondary containment shall be constructed secondary
to contain at least the following volumes: B. 150% of the largest container if there are multiple primary containers in a single
secondary
Cathodic protection tester will test cathodic 6 months
protection system within __ months of
installation and every __ years thereafter 3 years
A. If made of metal, exterior wall shall be protected from galvanic corrosion
Spill container shall meet the following B. Shall have minimum capacity of 5 gallons (19 L)
requirements: C. Shall have drain valve which allows drainage of the collected spill into the primary
container or provide means to keep spill cont empty
Overfill prevention shall alert transfer 90%
operator when tank is __% full
Flapper Valves shall provide positive shut off 95%
when tank is filled to no more than __%
capacity
Primary pressurized piping shall be tested 150%
for tightness hydrostatically at __% of design
operating pressure
Date that all UST systems must have Line November 9,2004
Leak Detector installed
Secondary containment testing shall be Installation
done upon ____, __months, and every ___ 6 months
months or __ years thereafter 36 months or 3 years
Owners/ops shall submit SCT results to local 30 days
agency within _ days of completion
All monitoring equipment shall be tested, 12 months
calibrated, operated, maintained, and
certified every __ months.
1/3
EUNICE
ICC / UST WITH 100% SUIRE ANSWERS
Terms in this set (40)
Corrosion Specialist designs and certifies cathodic protection system
A. 100% of usable capacity of primary where there is only one primary is within the
Secondary containment shall be constructed secondary
to contain at least the following volumes: B. 150% of the largest container if there are multiple primary containers in a single
secondary
Cathodic protection tester will test cathodic 6 months
protection system within __ months of
installation and every __ years thereafter 3 years
A. If made of metal, exterior wall shall be protected from galvanic corrosion
Spill container shall meet the following B. Shall have minimum capacity of 5 gallons (19 L)
requirements: C. Shall have drain valve which allows drainage of the collected spill into the primary
container or provide means to keep spill cont empty
Overfill prevention shall alert transfer 90%
operator when tank is __% full
Flapper Valves shall provide positive shut off 95%
when tank is filled to no more than __%
capacity
Primary pressurized piping shall be tested 150%
for tightness hydrostatically at __% of design
operating pressure
Date that all UST systems must have Line November 9,2004
Leak Detector installed
Secondary containment testing shall be Installation
done upon ____, __months, and every ___ 6 months
months or __ years thereafter 36 months or 3 years
Owners/ops shall submit SCT results to local 30 days
agency within _ days of completion
All monitoring equipment shall be tested, 12 months
calibrated, operated, maintained, and
certified every __ months.