IBC
–
International
Complete Building
BuildingCode
Code
IBC
Study
–
International
Complete
Guide & Building
ICC
Building
ExamCode
Code
Prep.pdf
Study
– Complete
Guide & Building
ICC Exam Code
Prep.pdf
Study Guide & ICC Exam Prep.pdf
IBC International Building Code –
Complete Building Code Study Guide &
ICC Exam Prep
Guidehttps://www.stuvia.com/dashboard!@_)#*)(@$)($@*($@)($@*_
IBC International Building Code
IBC
–
International
Complete Building
BuildingCode
Code
IBC
Study
–
International
Complete
Guide & Building
ICC
Building
ExamCode
Code
Prep.pdf
Study
– Complete
Guide & Building
ICC Exam Code
Prep.pdf
Study Guide & ICC Exam Prep.pdf
,IBC - International Building Code.pdf IBC - International Building Code.pdf IBC - International Building Code.pdf
Terms in this set (64)
A permit must be pulled for a retaining wall more 4'
than ______ high
Who may revoke a permit if it was issued in error or in The Building Official
violation of an ordinance ?
___________ __________ can issue a notice of violation Building Department
Type __________ Construction uses heavy timbers Type IV
IBC - International Building Code.pdf IBC - International Building Code.pdf IBC - International Building Code.pdf
, IBC - International Building Code.pdf IBC - International Building Code.pdf IBC - International Building Code.pdf
If you are operating a forklift in a warehouse building 5' when subjected to be hit by moving vehicles
with steel columns, what is the minimum height to
fireproof the columns to protect them from impact?
The Air and substrate temperature must be at least 40 degrees, 24 hours, SFRM
_______ for a period of __________ after ___________ has been
applied
Smoke barriers may be ________ thick steel in group 10" , I - 3
_________ buildings
___________ enclosures must have a ___________ fire rating Shaft, 2 hour , Four stories
when connecting more than ________ stories
__________ layers of 5/8" x Rated Gyp board on each side 2 Layers, 2 hour
of a 2x4 stud wall yields a ____________ hour fire rating
It shall be unlawful to occupy a building until the Fire Protection System , Inspected and Approved.
_____________ _________ _______________ for that portion of the
building has been __________ and ______________________
IBC - International Building Code.pdf IBC - International Building Code.pdf IBC - International Building Code.pdf