, LDP - with Correct answers:Land Developing Projects - altering landscape for projects
such as agriculture or housing ect.
NPDES - with Correct answers:National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges associated w
industrial activities PER permit
CWA Penalty Types - with Correct answers:Adminstrative
Class I. Neglegent
Class II. Knowlingly = greater fines
What documents are required on site? - with Correct answers:- SWPPP
- CGP
- Site Map
- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
Who is the "operator"? Also the LRP. - with Correct answers:Usually the OWNER of the
site, not the contractor, unless authorized by the owner to general contractor to have
day-to-day operational control!
When do you need permit coverage? - with Correct answers:Required from start to end
of project. "End" being the final vegetative/non-vegetative (concrete) stabilization
occuring.
For any project one acre or greater.
Large Land Development - with Correct answers:-strips off all existing vegetation a.k.a
site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
Vertical Projects - with Correct answers:- Homebuilding, smaller residence construction
projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas
Bix Box Projects - with Correct answers:-commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
Linear Projects - with Correct answers:-roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)
[Document subtitle]
[DATE]
[COMPANY NAME]
[Company address]
, LDP - with Correct answers:Land Developing Projects - altering landscape for projects
such as agriculture or housing ect.
NPDES - with Correct answers:National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges associated w
industrial activities PER permit
CWA Penalty Types - with Correct answers:Adminstrative
Class I. Neglegent
Class II. Knowlingly = greater fines
What documents are required on site? - with Correct answers:- SWPPP
- CGP
- Site Map
- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
Who is the "operator"? Also the LRP. - with Correct answers:Usually the OWNER of the
site, not the contractor, unless authorized by the owner to general contractor to have
day-to-day operational control!
When do you need permit coverage? - with Correct answers:Required from start to end
of project. "End" being the final vegetative/non-vegetative (concrete) stabilization
occuring.
For any project one acre or greater.
Large Land Development - with Correct answers:-strips off all existing vegetation a.k.a
site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
Vertical Projects - with Correct answers:- Homebuilding, smaller residence construction
projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas
Bix Box Projects - with Correct answers:-commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
Linear Projects - with Correct answers:-roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)