__________ is the art and science of coordinating people, equipment,
materials, money, and schedule to complete a specified project on time and
within approved costs - correct answer ✔project manangement
________________ describe the physical aspect of the structure, such as
arrangement, dimension, construction details, materials, and other information
necessary for estimating and construction - correct answer ✔drawings
a _____________ is an endeavor that is undertaken to produce the results
that are expected from the requesting party - correct answer ✔project
_____________________ are a written description of all materials, test,
methods, quality of workmanship for the project, and operating characteristics.
- correct answer ✔Technical specifications
___________________ is meeting the needs and satisfaction of the ultimate
end user of the project, the owner. - correct answer ✔Quality
________________ shows graphical representations of every item in the
facility sized and located to the fraction of an inch - correct answer ✔plans
________________sets operational criteria - correct answer ✔owner
_____________ produces plans and specifications - correct answer
✔designer
, _________________prepares and submits bid estimates - correct answer
✔contractor
_____________forms a course of actions to complete a project - correct
answer ✔planning
________________select appropriate team members - correct answer
✔staffing
______________arrange the resources to fit the project plan - correct answer
✔organizing
____________measure project performance based on planned vs actual -
correct answer ✔controlling
_____________________ serve as an effective leader in coordinating project
- correct answer ✔directing
What is the name of the textbook?
-mgmt of construction projects 1st edition
-construction project management 4th edition
-project management for engineering and construction 3rd edition
-construction business management 1st edition - correct answer ✔Project
management for engineering and construction 3rd edition
Which of the following contract types is the most applicable to a very complex
petrochemical refinery project delivered with a design build method?
-lump sum
-cost plus fee