ENCE 325 Final UPDATED Actual Exam Questions and CORRECT Answers Two condition documents of construction contracts - CORRECT ANSWER- General conditions and supplementary conditions The general conditions - CORRECT ANSWER- are "boilerplate" standards that apply to the project as a whole and which can be applied to multiple projects. Who is in charge of developing the general and supplementary conditions - CORRECT ANSWER- the architec

Content preview

ENCE 325 Final UPDATED Actual Exam
Questions and CORRECT Answers
Two condition documents of construction contracts - CORRECT ANSWER- ✔✔General
conditions and supplementary conditions


The general conditions - CORRECT ANSWER- ✔✔are "boilerplate" standards that apply to
the project as a whole and which can be applied to multiple projects.


Who is in charge of developing the general and supplementary conditions - CORRECT
ANSWER- ✔✔the architect



The general conditions - CORRECT ANSWER- ✔✔The general conditions are provided in
conjunction with the agreement. They outline the broad rights and responsibilities of the
parties; outline terms for making changes to the work; specify the procedures for contractor
payment; provide guidance for dealing with disputes or delays; and much more


AIA General Conditions - CORRECT ANSWER- ✔✔documents published by the American
institute of architects


Organization of AIA General Conditions - CORRECT ANSWER- ✔✔1. General Provisions
2. Owner
3. Contractor
4. architect
5. subcontractor
6. construction by owners or by separate contractors
7. changes in work
8. time
9. payment and completion
10. protection of persons and property
11. insurance and bonds
12. uncovering and correction of work

,13. miscellaneous provisions
14. termination or suspension of the contract
15. claims and disputes


Supplementary Conditions - CORRECT ANSWER- ✔✔A separate document where
adjustments to the general conditions are made


Items that might be in the supplementary conditions - CORRECT ANSWER- ✔✔-Damage to
the work or jobsite
-Special requirements regarding pedestrian flow
-scheduling and determination of progress
-permits
-special testing
-meeting requirements
-access to the site and maintenance of street traffic


contract documents - CORRECT ANSWER- ✔✔-Agreement
-General conditions
-supplementary conditions
-drawings
-specifications
-addenda and modifications


AIA A201 - CORRECT ANSWER- ✔✔General Conditions published by the American
Institute of Architects


Claim - CORRECT ANSWER- ✔✔a demand by one party seeking an adjustment in the
terms of a contract


conditions - CORRECT ANSWER- ✔✔the parts of a contract that define the basic right and
responsibilities of the parties

, dispute - CORRECT ANSWER- ✔✔a claim that has not been satisfactorily resolved



liquidated damages - CORRECT ANSWER- ✔✔a previously agreed-upon amount of money
the contractor is required to pay an owner if construction is not completed on time


termination (of a contract) - CORRECT ANSWER- ✔✔the voluntary or involuntary end of a
contract


work, the (scope of work) - CORRECT ANSWER- ✔✔the obligations defined by the
contract documents


the specifications - CORRECT ANSWER- ✔✔describe in written form, what cannot be
conveyed by the drawings alone; they detail materials, processes, and quality, such as the
type of concrete; the brand, color and weight of carpeting; and the manufacturer, material, or
glazing for the doors


Project Manual - CORRECT ANSWER- ✔✔provides an organizational framework for all the
written documents


specifications include: - CORRECT ANSWER- ✔✔- quality of materials and products
- quality assurance
- special installation requirements
- submittals (assure the contractor provides the correct products)


Descriptive Specification - CORRECT ANSWER- ✔✔may be the most common, and
provide product details without specifically mention a brand name


Performance Specifications - CORRECT ANSWER- ✔✔identify the ends to be achieved, but
not how the ends are acheived


reference specifications - CORRECT ANSWER- ✔✔identify a required standard such as
ASTM, State of New York...

Document information

Uploaded on
September 26, 2024
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(238)
Sold
1578
Followers
108
Items
114633
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions