NCCCO Lattice Boom General Knowledge Exam Questions with Verified Answers The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - correct answer -2% The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - correct answer -A. 75% The most unstable working quadrant for a crawler crane is the; - correct answer -Side

Show more Read less
Institution
NCCCO Lattice Boom General Knowledge
Course
NCCCO Lattice Boom General Knowledge









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO Lattice Boom General Knowledge
Course
NCCCO Lattice Boom General Knowledge

Document information

Uploaded on
September 25, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO Lattice Boom General Knowledge Exam
Questions with Verified Answers

The lattice boom is designed to take winds of up to 20 mph. from the side
plus a full rated load, plus a direct side load equal to what percent of the
rated load? - correct answer -2%
The part of the load chart governed by stability is based on what percentage
of capacity while a crawler crane is working over the side quadrant? -
correct answer -A. 75%
The most unstable working quadrant for a crawler crane is the; - correct
answer -Side
What type of capacity is listed on a crane load chart? - correct answer -Static
If the manufacture of a particular crane does not specifically permit pick
and carry operations what procedure must be followed during this
operation? - correct answer -Don't make any pick and carry lifts
What is the main purpose of a jib/extension? - correct answer -To extend
reach higher or up and over
When the number of layers of rope on a drum increase the line
pull___________. - correct answer -Decreases
When handling boom sections, the best place for slings to be attached is; -
correct answer -At the pin connections at the ends of the top chords
Placing timber blocking under the tips of the tracks on a crawler crane will;
- correct answer -Make the crane more stable
What is the major effect of stopping suddenly a rapid swing while operating
long boom crane? - correct answer -Action may cause the crane boom
collapse and/or overturn the crane
According to B30.10 hooks shall be removed from service when the throat
opening exceeds _____ the original throat opening. - correct answer -5%

, On a crawler crane ground bearing pressure is greatest where? - correct
answer -Over the corner
During disassembly of a long boom, the pendant lines are connected at the
maximum cantilever point and the boom is slightly lifted off the ground,
which boom connection pins are to be removed next? - correct answer -The
bottom pins ahead of the cantilever point
The definition of cantilever of a lattice boom crane is; - correct answer -The
boom suspended past the pendant connections
Most crane manufactures require the load chart capacities must be reduced
when wind speed reaches; - correct answer -20 mph
What chart do you use when operating a crane on a barge; - correct answer -
List chart
According to OSHA, Jibs must have a positive ________ from backwards
overturning - correct answer -Stop
Mobile cranes on barges shall be - correct answer -Physically attached to the
barge
When a crane is properly barricaded, what is the clearance required all the
way around 360 degrees between the superstructure and the barricade
when swung 360 degrees? - correct answer -2 feet
According to ASME B30.5 a fire extinguisher shall have a rating of
__________ and shall be available at all operator's stations or cabs of the
equipment. - correct answer -10 BC or higher
When assembling a lattice boom crane the top pins of the boom sections
should be inserted; - correct answer -First
Block hoisting sheaves should have a minimum pitch diameter of at
least________ the rope diameter. - correct answer -16 times
What is the correct method of checking the brakes of crane that has been
already assembled? - correct answer -Lift the load a few inches off the
ground and apply the brakes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartScoreAcademics Rasmussen College
View profile
Follow You need to be logged in order to follow users or courses
Sold
26
Member since
2 year
Number of followers
8
Documents
147
Last sold
3 months ago

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions