100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCCO Core Questions & correct answers(graded A+)

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
24-09-2024
Written in
2024/2025

The term "Superstructure or Upper works" refers to the area of the crane: - ANSWER Above the swing circle A crane must be level within _______% for the load chart ratings to be valid? - ANSWER 1% On what principle is crane stability based? - ANSWER Leverage What would be the effect of moving the tipping axis closer to the cranes center of gravity? - ANSWER Reduced stability Which of the following matches the appropriate load chart to a particular crane? - ANSWER Serial number When the boom angle falls between the capacities listed in the load chart use the gross capacity for the - ANSWER Lower boom angle When load charts are between the values listed in the load chart, the value that must be used is the: - ANSWER Lower at a longer radius A load moment indicator (LMI) is a computer installed on cranes designed to:

Show more Read less
Institution
NCCCO Core
Course
NCCCO Core










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO Core
Course
NCCCO Core

Document information

Uploaded on
September 24, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NCCCO Core Questions
& correct
answers(graded A+)

The term "Superstructure or Upper works" refers to the area of the crane: -
ANSWER Above the swing circle


A crane must be level within _______% for the load chart ratings to be valid? -
ANSWER 1%


On what principle is crane stability based? - ANSWER Leverage


What would be the effect of moving the tipping axis closer to the cranes center of
gravity? - ANSWER Reduced stability


Which of the following matches the appropriate load chart to a particular crane? -
ANSWER Serial number

,When the boom angle falls between the capacities listed in the load chart use the
gross capacity for the - ANSWER Lower boom angle


When load charts are between the values listed in the load chart, the value that
must be used is the: - ANSWER Lower at a longer radius


A load moment indicator (LMI) is a computer installed on cranes designed to:
provide the operator with information regarding the boom length, boom angle,
boom tip height, working radius, rated load and a total calculated weight being
lifted by the crane. The LMI also warns an operator when an overloading situation
is about to occur. - ANSWER True


. A crane operator plans to lift a gross load that weighs 26,300 Ibs. Based solely on
the line pull of the crane base 6,000 Ibs. what are the minimum parts of line
required to — make the lift? - ANSWER Five


Backward stability on a truck mounted crane could be dangerous when the crane
is working on rubber, boom angle, minimum boom length: - ANSWER Over the
side at a minimum radius


Hydraulic cranes shall be equipped with holding valves to prevent boom lowering
in the event of - ANSWER Hydraulic Failure


What is the sum of the following deductions? Block = 1,350 Ibs; Rigging = 55 Ibs;
Lifting beams = 200Ibs; - ANSWER 1,605 lbs.


What is the minimum number of wraps required by OSHA to remain on load hoist
drums? - ANSWER 2 wraps

, It is important to know when lubricating wire rope that the lubricant must: -
ANSWER Not hinder visual inspection


When replacing the hoist line on a crane, how do you determine the size or type
of wire rope? - ANSWER Use manufacture's operator's manual or load chart


On running ropes showing any evidence of heat damage, or wear of 1/3 of original
individual wires you must: - ANSWER Remove the rope from service


The most commonly used rope for the hoist lines is right regular lay (RRL). How
many random wires be remove a RRL wire from service? - ANSWER 6 in one lay or
3 in one strand in one lay


Breaking strength divided by the design (safety) factor equals: - ANSWER Safe
working load


When retracting the boom on a telescopic boom crane: - ANSWER The hook and
load decrease their height off the ground
A durable rating chart with legible letters and figures shall be provided with each
crane accessible to: - ANSWER The operator at the controls


The lifting capacities listed in the load chart assume that: - ANSWER The lift is to
be performed under ideal conditions


A "rough terrain" crane set up on outriggers that is based on 85% tipping should
have the tires: - ANSWER Off the supporting surface

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Exampool NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
219
Member since
2 year
Number of followers
147
Documents
3593
Last sold
5 days ago
Power-horse Library

HELLO Dear ones On this Account you will find all Study related Materials ,EXAMS, STUDY GUIDES, CASES,NOTEBOOKS and many more. well come as we study for Excellency.

3.9

32 reviews

5
16
4
2
3
10
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions