Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

NCCCO Practice Test 100% accurate.

Document preview thumbnail
Preview 2 out of 5 pages

To provide protection in the crane's work area, barriers MUST be erected in accessible areas: A. Within machinery housing C. Within maximum radius D. In landing area - ANSWER B.Within the equipment's rotating structure All of the following can cause a two-block condition EXCEPT: A. Extending the boom B. Lowering the boom C. Hoisting up with the winch - ANSWER D. Raising the boom When rotation of the load may be hazardous, the operator must B. Use a longer radius C. Caution all personnel to remain clear of the load D. land the load to stop rotation - ANSWER A. Ensure that a tag line is used According to OSHA 1926 Subpart CC, which of the following is part of a crane shift inspection? A. Warning labels C. Leaking exhaust

Content preview

NCCCO Practice Test 100%
accurate.
To provide protection in the crane's work area, barriers MUST be erected in
accessible areas:
A. Within machinery housing
C. Within maximum radius
D. In landing area - ANSWER B.Within the equipment's rotating structure


All of the following can cause a two-block condition EXCEPT:
A. Extending the boom
B. Lowering the boom
C. Hoisting up with the winch - ANSWER D. Raising the boom


When rotation of the load may be hazardous, the operator must
B. Use a longer radius
C. Caution all personnel to remain clear of the load
D. land the load to stop rotation - ANSWER A. Ensure that a tag line is used


According to OSHA 1926 Subpart CC, which of the following is part of a crane shift
inspection?
A. Warning labels
C. Leaking exhaust

, D. Check valves - ANSWER B. Ground conditions
According to OSHA 1926 Subpart CC, how many randomly distributed broken
wires in rotation resistant wire rope are cause for replacement?
A. 2 broken wires in 30 rope diameters
C. 1 broken wires in 6 rope diameters
D. 3 broken wires in one strand in one lay - ANSWER B. 2 broken wires in 6 rope
diameters


What crane operation signal is illustrated?
A. Raise the load
C. Raise the boom
D. Use the main hoist - ANSWER B. Extend the boom


what site conditions must an operator be concerned about prior to setting up a
crane?
A. Voltage rating in buried cables
B. Access roads must not exceed 5%
C. Compaction strength must exceed 1.5 - ANSWER D. Soil stability must be
sufficient


The best way to determine the weight of the load to be lifted is to:
A. Use the load moment indicator in the crane
B. Use the weight of the original drawing and add all the weight of the rigging
D. Calculate the weight of the load using standard mathematical formulas -
ANSWER C. Have a certified load weight and add in the weight of all the rigging

Document information

Uploaded on
September 24, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Exampool
3.9
(32)
Sold
225
Followers
148
Items
3589
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions