• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|

Document preview thumbnail
Preview 2 out of 8 pages

CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES|

Content preview

CALIFORNIA UST SERVICE TECHNICIAN PART 1
EXAM 2024-2025 ACTUAL EXAM QUESTIONS
AND CORRECT DETAILED ANSWERS WITH
RATIONALES|

Terms in this set (60)


July 1 2005, service techs California UST service technician exam
shall possess or work
under someone who has a
current certification
indicating he or she has
passed the ?

ICC cert must be renewed 24 months
every?

Service techs must posses The individual has a Tank testing licens
or be employed by a
person who has the
appropriate contractors
license unless?

Test UST monitoring equipment
Service tech is defined by
Trouble shoots UST systems
any individual who?
Installs UST monitoring equipment

If the manufacturer Approve comparable alternat training .
training no longer exist ,
the local angency may?

UST includes? Tank and connected piping

What is considered and petroleum storage tank
UST

, What UST system meets Doubled wall tanks
the requirements for
secondary containment?

According to title 23; the Pressured product piping
following piping
components if installed
after July 1 1987 must have
secondary containment

Considered "pipe" on Pressured product piping and below ground vapor
tanks installed after July 1 recovery
2003

Under dispenser December 31 2003
containment (UDC) was
required for all UST
systems by

System for exchanging Stage 1 vapor recovery
gas vapors in a storage
tank and product in a fuel
delivery truck

An approved method for Statistical Inventory Reconciliation (SIR)
non visual monitoring for
existing UST systems.

ATG must be capable for .2 gallons per hour
detecting a release of ?

Manual inventory No longer an approved method for non visual
reconciliation. monitoring on existing UST systems

Automatic line leak 3 gallons per hour at 10 psi
detectors installed on
underground piping with
secondary containment
shall be capable of
tetecting a leak of ?

Document information

Uploaded on
September 18, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheAlphanurse
4.2
(385)
Sold
5794
Followers
178
Items
6639
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions