NERC book quiz Brief Questions with Adequately Approved Answers Graded A++ Pass

Document preview thumbnail
Preview 3 out of 23 pages

_______ is a full time data network used for the purpose of sharing operational security information - CORRECT ANSWER -Interregional security network A 100 MW generator at 50 MW output has a 5% governor droop response will respond to how much of a -.15Hz frequency deviation (actual frequency 59.85 Hz) - CORRECT ANSWER -+5 MW A 200 MW transaction starts at the top of the hour and is terminated at 30 minutes past the hour. If a ten minute ramp is used what is the interchange MWh for this - CORRECT ANSWER - 100 MW A BA or Reserve sharing group shall fully restore its contingency reserves within the contingency reserve restoration period for its interconnection. The contingency reserved restoration period begins - CORRECT ANSWER -At the end of the disturbance recovery period A BES CYBER system can be viewed simply as a grouping of Critical cyber assets - CORRECT ANSWER -True A generator's capability for system restoration purpose is determined by what? - CORRECT ANSWER -Periodic blackstart testing A lightly loaded 500 Kv transmission line has a capacitive effect which tends to - CORRECT ANSWER -Cause high voltage problems that are corrected by placing reactor banks in service A proper operating protective relay scheme should normally operate for - CORRECT ANSWER -Faulted system facilities A shunt capacitor bank with nominal value of 60 MVARS is on a bus with a voltage of .9 p.u. The actual VARS delivered by the capacitor bank would be: - CORRECT ANSWER -48 MVAR

Content preview

NERC book quiz Brief Questions with Adequately

Approved Answers Graded A++ Pass

_______ is a full time data network used for the purpose of sharing operational security

information - CORRECT ANSWER ✔✔ -Interregional security network


A 100 MW generator at 50 MW output has a 5% governor droop response will respond to how

much of a -.15Hz frequency deviation (actual frequency 59.85 Hz) - CORRECT ANSWER ✔✔

-+5 MW

A 200 MW transaction starts at the top of the hour and is terminated at 30 minutes past the hour.

If a ten minute ramp is used what is the interchange MWh for this - CORRECT ANSWER ✔✔ -

100 MW

A BA or Reserve sharing group shall fully restore its contingency reserves within the

contingency reserve restoration period for its interconnection. The contingency reserved

restoration period begins - CORRECT ANSWER ✔✔ -At the end of the disturbance recovery

period

A BES CYBER system can be viewed simply as a grouping of Critical cyber assets - CORRECT

ANSWER ✔✔ -True


A generator's capability for system restoration purpose is determined by what? - CORRECT

ANSWER ✔✔ -Periodic blackstart testing

,A lightly loaded 500 Kv transmission line has a capacitive effect which tends to - CORRECT

ANSWER ✔✔ -Cause high voltage problems that are corrected by placing reactor banks in

service

A proper operating protective relay scheme should normally operate for - CORRECT ANSWER

✔✔ -Faulted system facilities


A shunt capacitor bank with nominal value of 60 MVARS is on a bus with a voltage of .9 p.u.

The actual VARS delivered by the capacitor bank would be: - CORRECT ANSWER ✔✔ -48

MVAR

A single control areas disturbance is the sole coase for a frequency dip. The frequency has

stabilized at 59.85 Hz. Manual load shedding is the only option to restore freenacu to 60 Hz. the

entire interconnection load was 10,000 MW at the time of disturbance and all connected

generators have a 5% droop characteristic. Approximately how much load needs to be shed to

restore frequency to 60 Hz - CORRECT ANSWER ✔✔ -500MW


A system disturbance has caused your BA to lose tie line RTUs with a neighboring BA and all

frequency meters which telemetered data into your EMS. How would you operate your GC

system for this scenario? - CORRECT ANSWER ✔✔ -Place all generating units on manual

control and try as best you can to match generation with load

A system in the process of restoration has 1000MW of synchronized generation and 700 MW of

connected load. What amount of load should be shed to raise frequency by .5 Hz - CORRECT

ANSWER ✔✔ -50 MW

, ABC BA has exhausted its native generation capacity and its firm purchases are limited due to

tie line transfer capability to the extent that ABC is not going to be able to meet its native load

plus regulating requirements. In this situation ABC will request that its RC issue a(n)? -

CORRECT ANSWER ✔✔ -Energy Emergency Alert


After a disturbance you have 40% of your load intact, you ACE is near zero and your frequency

is increased for 59.5 Hz you should do what - CORRECT ANSWER ✔✔ -Take no immediate

action

After a disturbance, you have 40% of you load intact, but your frequency keeps declining You

should do what - CORRECT ANSWER ✔✔ -Shed load


After load forecast is completed, the generating units should be assigned by unit commitment to

meet forecasted load and what else? - CORRECT ANSWER ✔✔ -Reserve obligation


All electorice schedule communications shall be in - CORRECT ANSWER ✔✔ -CST


All telecommunication channels shall be - CORRECT ANSWER ✔✔ -Periodically tested or

monitored on-line

An alarm comes in on your SCADA. You notice a bus breaker is showing closed even though

the bus is showing to be de-energized. You notice that a remote line breaker associated with this

bus is shown to be open. What is the cause of this SCADA indication? - CORRECT ANSWER

✔✔ -Breaker failure with a back up relay operation


An interchange transaction has the following energy profile:

Start at 08:00, Stop at 18:00, 60 MW, Ramp tart 07:55, Ramp duration 10 minutes

Document information

Uploaded on
September 17, 2024
Number of pages
23
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
2
Items
699
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions