CTS-I Study Guide: Complete With Solutions
JTA Right Ans - job task analysis
PEMDAS Right Ans - Parentheses, Exponents, Multiplication, Division,
Addition, Subtraction
Current Right Ans - I or A
Voltage Right Ans - V or E
AC Right Ans - Alternating Current such as a loudspeaker
WBS (Work Breakdown Structure) Right Ans - a hierarchy of the tasks
required to complete a project
Gantt Chart Right Ans - A time and activity bar chart that is used for
planning, managing, and controlling major programs that have a distinct
beginning and end.
Logic Network Diagram Right Ans - Which Tasks must be completed before
you can begin next task
Scope of Work Right Ans - The parameters defining the overall extent of
work to be included in a construction contract. The project scope is commonly
communicated through construction plans and written specifications.
Site Survey - Before you go Right Ans - Review Drawings, verify connectors,
ID loudspeaker configuration, confirm tap values, confirm impedance, record
models and serial numbers on documentation
Reusing existing equipment Right Ans - verify and document that parts
perform. This can lead to new business opportunities
Letter of transmittal Right Ans - a letter that delivers the report to the
client and summarizes the researcher's overall experience with the project
without mentioning the findings
CCD Right Ans - Field Order
, plan drawing Right Ans - a view drawn from above
reflective ceiling plan Right Ans - locations of AV equipment, loudspeakers,
projectors
elevation drawing Right Ans - A head-on view of an external or internal
wall, outlets, windows, doors, AV face plate, chair rails
section drawing Right Ans - A cross sectional view that shows the inside of
an object or building.
Detail Flag Right Ans - for items too small to seen in a typical drawing scale
architectural drawings Right Ans - Drawings that contain information
about the size, shape, and locations of all parts of a house or structure.
column line Right Ans - used to indicate the location of columns, load
bearing walls, and other structural elements
elevation flags Right Ans - indicate related elevation drawings. center # is
page, letter indicate elevation drawing, drawn and presented in order
clockwise
Section cut flags Right Ans - indicate which section drawing depicts a
section of a master drawing in more detail, bottom # is page Top # is section
drawing
fiber-optic cable Right Ans - A cable that transmits data at close to the
speed of light along glass or plastic fibers. Center core surrounded by
cladding, surrounded by coating
components of connector for fiber Right Ans - Ferrule - holds the fiber in
place, Connector body - holds ferrule and fiber, cable - connector body point of
entry, coupling device - mates connectors of the same gender
Connectors that work with Fiber Right Ans - ST, LC, SC, Hermaphroditic,
expanded beam
JTA Right Ans - job task analysis
PEMDAS Right Ans - Parentheses, Exponents, Multiplication, Division,
Addition, Subtraction
Current Right Ans - I or A
Voltage Right Ans - V or E
AC Right Ans - Alternating Current such as a loudspeaker
WBS (Work Breakdown Structure) Right Ans - a hierarchy of the tasks
required to complete a project
Gantt Chart Right Ans - A time and activity bar chart that is used for
planning, managing, and controlling major programs that have a distinct
beginning and end.
Logic Network Diagram Right Ans - Which Tasks must be completed before
you can begin next task
Scope of Work Right Ans - The parameters defining the overall extent of
work to be included in a construction contract. The project scope is commonly
communicated through construction plans and written specifications.
Site Survey - Before you go Right Ans - Review Drawings, verify connectors,
ID loudspeaker configuration, confirm tap values, confirm impedance, record
models and serial numbers on documentation
Reusing existing equipment Right Ans - verify and document that parts
perform. This can lead to new business opportunities
Letter of transmittal Right Ans - a letter that delivers the report to the
client and summarizes the researcher's overall experience with the project
without mentioning the findings
CCD Right Ans - Field Order
, plan drawing Right Ans - a view drawn from above
reflective ceiling plan Right Ans - locations of AV equipment, loudspeakers,
projectors
elevation drawing Right Ans - A head-on view of an external or internal
wall, outlets, windows, doors, AV face plate, chair rails
section drawing Right Ans - A cross sectional view that shows the inside of
an object or building.
Detail Flag Right Ans - for items too small to seen in a typical drawing scale
architectural drawings Right Ans - Drawings that contain information
about the size, shape, and locations of all parts of a house or structure.
column line Right Ans - used to indicate the location of columns, load
bearing walls, and other structural elements
elevation flags Right Ans - indicate related elevation drawings. center # is
page, letter indicate elevation drawing, drawn and presented in order
clockwise
Section cut flags Right Ans - indicate which section drawing depicts a
section of a master drawing in more detail, bottom # is page Top # is section
drawing
fiber-optic cable Right Ans - A cable that transmits data at close to the
speed of light along glass or plastic fibers. Center core surrounded by
cladding, surrounded by coating
components of connector for fiber Right Ans - Ferrule - holds the fiber in
place, Connector body - holds ferrule and fiber, cable - connector body point of
entry, coupling device - mates connectors of the same gender
Connectors that work with Fiber Right Ans - ST, LC, SC, Hermaphroditic,
expanded beam