• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

CSA A23.2-19C (Slump Flow) with 100% correct answers

Document preview thumbnail
Preview 1 out of 3 pages

The maximum nominal size of aggregate in a concrete sample that is appropriate when a slump flow test is to be performed is. Mm 28 When the concrete contains aggregate larger than allowed in the Slump flow test must be performed, what must be done to the concrete sample It must be wet sieve over 28 mm sieve Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:00 / 0:15 Full screen Brainpower Read More The requirements for the test specimen mould when performing the slump flow test are the same as. With the exception. Of. Which are not mandatory for this test method The slump test, the 2 foot pieces The minimum Slump flow board dimensions are At least 800 mm² The slump flow test must be completed within. Minutes of obtaining the sample including transportation and mixing 10 A piece of finished plywood makes a good slump flow board true or false False The slump flow con should be in a dry condition before beginning the test False The maximum time permitted from the start of filling the cone with concrete to the lifting of the cone from the base is. Minutes Three What is the time allowed for lifting the Slump flow con Three +/- 1 To what range in height should the slump flow con be raised 225mm +/- 75mm A minimum sample size of 20 L is required for all slump flow test true or false False When performing the slump flow test the surface shall be. , , Having a minimum t thickness of. Mm the surface shall be in a And. Position, not subject to. . (Rigid, non-absorbent, smooth plastic surface,) 12, flat, level The slump flow con may be filled in. Or. Position and must be filled in. Layers when performing the Slump flow test Upright, inverted, one The slump flow con must be filled in the. Position when the T50cm times is performed Upright To concentric circles are to be marked on the Slump wall surface from its centre the inner circle is to. The position of the mold, and the outer circle is to have a diameter of. Mm Centrally located, 500 mm

Content preview

CSA A23.2-19C (Slump Flow)
with 100% correct answers
The maximum nominal size of aggregate in a concrete sample that
is appropriate when a slump flow test is to be performed is. Mm -
answer 28


When the concrete contains aggregate larger than allowed in the
Slump flow test must be performed, what must be done to the
concrete sample - answer It must be wet sieve over 28 mm sieve


The requirements for the test specimen mould when performing the
slump flow test are the same as. With the exception. Of. Which are
not mandatory for this test method - answer The slump test, the 2
foot pieces


The minimum Slump flow board dimensions are - answer At least
800 mm²


The slump flow test must be completed within.
Minutes of obtaining the sample including transportation and
mixing - answer 10


A piece of finished plywood makes a good slump flow board true or
false - answer False


The slump flow con should be in a dry condition before beginning
the test - answer False

Document information

Uploaded on
September 13, 2024
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAINBOOSTERS
4.5
(355)
Sold
786
Followers
257
Items
25924
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions