• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Lean Bronze Certification Flashcards _ Study Guide With Correct Answers..pdf

Document preview thumbnail
Preview 2 out of 5 pages

Lean Bronze Certification Flashcards _ Study Guide With Correct Answers..pdf

Content preview

9/11/24, 7:22 PM



Lean Bronze Certification
Jeremiah




Practice questions for this set
Terms in this set (118)

Continuous Flow high production volume, highly standardized commodity products

automatically stopping the process when something is wrong and then fixing the
Jidoka
problems on the line itself as they occur

An improvement process focused on improving the condition of a machine and then
Autonomous Maintenance
identifying, standardizing and training on operator maintenance tasks

Signal for a need or problem with equipment or process. Example of visual
Andon light
management


Lean Bronze Certification




1/5

, 9/11/24, 7:22 PM
This helps to capture and share knowledge in a structured way. Its commonly used as a
A3 document problem-solving tool. This should also be used as a coaching tool between a coach
and a learner. Reference Managing to Learn by John Shook.

Empowered Employees The heart and soul of a lean organization according to Masaaki Imai (Gemba Kaizen)

Sort The first step of 5S

Highland Park The Ford Factory that housed the Model T production

A general agreement by team members. Not everyone may fully agree with the idea
consensus
but no one is openly opposed and they can "live with it".

To align the tactical actions and improvements to the strategic objectives of the
Goal of Hoshin Kanri business. This is a layered process which should be flowed from the higher level group
and then down to the next level.

cross-functional team Employees from different areas coming together to complete a task or solve a problem

A type of system is used when product variation is high and it doesn't make sense to
Sequential pull system keep an inventory of each product. With this type of system, we control the overall
inventory in the system by only releasing when a trigger is created.

According to Dennis (Lean Production Simplified), the greatest enabler of mass
interchangeable parts
production

"Separating Man from Machine" describes the ability to have one operator run multiple
Standardized Work & Jidoka
machines. This is enabled by

Standardized Work Route of the operator is clear and documented

Little's law The relationship between work in process (WIP), throughput and lead time

PQCDSM A core set of goals and measures that we are tracking on a daily basis.

Value Stream The entire sequence of work required to bring a product from raw material to delivery

"The Goal" by Goldratt popularized this concept which focuses on bottleneck
Theory of Constraints
management

Joseph Juran This person introduced the Pareto principle as it applies to quality control

PERT Calculations (Optimistic + 4 x Most Likely + Pessimistic) / 6

PERT A scheduling and program planning method

SMART goal Specific, Measurable, Achievable, Realistic and Timely

Transportation, Inventory, Motion, Waiting, Overprocessing, Overproduction, and
7 types of Muda
Defects

waste The fundamental concept behind lean manufacturing is the elimination of __________

WIP calculaton Leadtime x Throughput

set in order a place for everything and everything in its place

NUMMI The name of the joint venture between GM and Toyota

Concentration diagrams "Measles Charts" are another way to describe what tool

Taiichi Ohno Who is most often referred to as the godfather of lean manufacturing

Reduction of changeover times SMED (Single Minute Exchange of Dies) focuses on

Value Stream Mapping Learning to See by Shook and Rother is widely regarded as the foundation of what

JIT and Jidoka The pillars of the Toyota Production System (TPS)
Red tag area During the 5S Sort phase, where should we put items that we don't think we need

Lean
Gemba Bronze
walks Certification An opportunity for leaders to walk the floor, ask questions, understand reality and learn


2/5

Document information

Uploaded on
September 11, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Denyss
5.0
(2)
Sold
25
Followers
3
Items
6242
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions