• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Asbestos Building Inspector Initial

Document preview thumbnail
Preview 2 out of 6 pages

Asbestos Building Inspector Initial

Content preview

MASBESTOS BUILDING INSPECTOR
INITIAL QUESTIONS WITH COMPLETE
SOLUTION

AHERA - The Asbestos Hazard Emergency Response Act. 40 CFR Part 763, Subpart E. Started 1986 and
requires that all schools, grades K-12 (non-profit), be inspected for the presence of ACBM (asbestos-
containing building material).

ACBM - Asbestos Containing Building Material

ASHARA - The Asbestos School Hazard Abatement Reauthorization Act. Started 1990, effective Nov.
1992, requires that an accredited Building Inspector perform any asbestos inspection conducted in a
public or commercial building. Extended the training requirement to cover asbestos workers,
supervisors, and inspectors in public and commercial buildings. ("Under the ASHARA revisions AHERA's
training requirements now apply to all persons working with asbestos in public and commercial
buildings...")

Increased number of hours required for asbestos worker and supervisor training to 32 and 40 hrs
respectively.

Building Inspector Responsibilities (AHERA & ASHARA) - 1. Determining whether ACBM is present in a
building

2. Assessing the physical characteristics of the ACBM within the building.

A building inspection involves: - 1. Investigation of records for the identification of ACBM

2. A physical and visual inspection of the building for suspect materials

3. Sampling and analyzing suspect materials to test for asbestos

4. Assessing the condition and location of the ACBM and other characteristics of the building

Management Planner Role - Uses info from the building inspection to estimate the degree of current or
potential hazard posed by the ACM and develop a plan for managing the ACM. After ACM is confirmed,
create O&M plan, stays in effect until ACM is removed.

OSHA - Occupational Safety and Health Administration - Protects workers

How AHERA affects your work/changed things: - 1. Defines ACM as being more than 1%.

2. Lays out 5 control methods: operations and maintenance, enclosure, encapsulation, repair, and
removal.

3. Describes clearance air sampling at end of job with aggressive air sampling and a TEM.

, 4. Regulates training classes like this one and requires this training for all workers working with asbestos
(excludes single-family homes)

What are the 5 control methods for asbestos, and what laid them out? - O&M, enclosure, encapsulation,
repair, and removal. AHERA created.

TEM - Transmission Electron Microscope/Microscopy. May be used to detect smaller fibers of asbestos.

ASHAA - Asbestos School Hazard Abatement Act. 1984, Directed EPA to help schools carry out their
asbestos hazard responsibilities.

MAP - Model Accreditation Plan. From EPA, said now everyone doing things with asbestos must adhere,
not just schools.

Public and commercial buildings: - All buildings other than school buildings and apartment buildings with
greater than 10 units.

NESHAP - National Emissions Standard for Hazardous Air Pollutants. 40 CFR Part 61, Subpart M

How NESHAP affects your work/changes things: - 1. Defines any job at least 160 sqft (100 in SoCal under
SCAQMD), 260 lf, or 35 cf as a large job

2. Asbestos must be wet before taken down and sealed in airtight container

3. Employer must notify EPA of the job 10 working days before begins (notify even if no asbestos for a
demo)

4. Waste bags must be labeled with the location of the job and name of waste generator, be 6 mil thick,
say "Danger

contains asbestos fibers

avoid creating dust

cancer and lung disease hazard"

4. Buildings musts be inspected for asbestos prior to demo or reno.

5. Requires there be no visible emissions to the outside air during removal

Buildings covered under NESHAP (and exclusions) - Excluded: private homes and apartment buildings
with 4 or less units (Except these are covered still in SoCal under SCAQMD)

Included: Institutional Buildings (hospitals, schools), commercial buildings (offices, apartment buildings),
industrial buildings (warehouses, factories).

Removal before reno or demo rule & exceptions - All RACM must be removed before demo or reno of a
building if the amount of ACM is greater than 160 sqft, 260 lf, or 35 cf

Exception: Does not need to be removed if it's Cat I nonfriable ACM (packing, gaskets, asphalt roofing,
vinyl - have flexibility and won't become DUST if hit), on a component packed in concrete, not accessible
for testing, not discovered before demo, or Cat II nonfriable (that are unlikely to become crumbled, or
reduced to powder during demo).

Document information

Uploaded on
September 11, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
edunurse
3.6
(19)
Sold
154
Followers
13
Items
6803
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions