• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

NCCCO Questions Test 1

Document preview thumbnail
Preview 1 out of 2 pages

Where is the best location for leveling a crane? Upperworks When determining the "gross load" the best method is: Get an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? Basket, vertical, choker What is the purpose of using a jib? Increase height When taking a side strain on a boom, what concerns the operator most? Boom damage You should always have at least how many wraps on a hoist drum? 2 On a load chart, values above the bold line mean: Capacities based on structural competence. The primary purpose for a rooster sheave or Auxiliary boom point is to: Separate the hoist lines. What is the proper procedure when using an insulating link or a boot near power lines? Be sure to maintain the correct allowable distance from the lines. When the number of layers of rope on a drum increases, the: Allowable line pull decreases. What is the minimum allowable distance from the crane and power lines under 50kV? 10 ft. The term "Upperworks or Superstructure" refer to the area of the crane: Above the turntable Side loading may be caused by: Starting or stopping the swing too rapidly. What is the best procedure to follow when underground utilities may be present? Contact local utility company Eccentric main boom tip reeving causes: Twisting of the boom How many randomly broken wires must there be to remove a running wire rope from service? 6 When lifting personnel in a man-basket using 6x19 wire rope, the minimum safety factor is? 7 What is the safety factor required when using non rotating wire rope and lifting personnel in a man-basket? 10

Content preview

NCCCO Questions Test 1
gh gh gh




Whereghisghtheghbestghlocationghforghlevelingghaghcrane? Upperworks
Whenghdeterminingghthegh"grossghload"ghtheghbestghmethodghis:
Getghanghaccurateghloadghweightghandghaddghtheghrigging.
Byghorderghofghhitchghstrength,ghwhichghisghtheghcorrectghanswer? Basket,ghvertical,ghchoker
Whatghisghtheghpurposeghofghusingghaghjib? Increaseghheight
Whenghtakingghaghsideghstrainghonghaghboom,ghwhatghconcernsghtheghoperatorghmost? Boomghdamage
Youghshouldghalwaysghhaveghatghleastghhowghmanyghwrapsghonghaghhoistghdrum? 2
Onghaghloadghchart,ghvaluesghaboveghtheghboldghlineghmean:
Capacitiesghbasedghonghstructuralghcompetence.
TheghprimaryghpurposeghforghaghroosterghsheaveghorghAuxiliaryghboomghpointghisghto:
Separateghtheghhoistghlines.
Whatghisghtheghproperghprocedureghwhenghusingghanghinsulatingghlinkghorghaghbootghnearghpowerghlines?
Beghsureghtoghmaintainghtheghcorrectghallowableghdistanceghfromghtheghlines.
Whenghtheghnumberghofghlayersghofghropeghonghaghdrumghincreases,ghthe:
Allowableghlineghpullghdecreases.
Whatghisghtheghminimumghallowableghdistanceghfromghtheghcraneghandghpowerghlinesghundergh50kV?
10ghft.
Theghtermgh"UpperworksghorghSuperstructure"ghreferghtoghtheghareaghofghtheghcrane:
Aboveghtheghturntable
Sideghloadingghmayghbeghcausedghby: Startingghorghstoppingghtheghswingghtooghrapidly.
Whatghisghtheghbestghprocedureghtoghfollowghwhenghundergroundghutilitiesghmayghbeghpresent?
Contactghlocalghutilityghcompany
Eccentricghmainghboomghtipghreevingghcauses: Twistingghofghtheghboom
Howghmanyghrandomlyghbrokenghwiresghmustghthereghbeghtoghremoveghaghrunningghwireghropeghfromghservi
ce? 6
Whenghliftingghpersonnelghinghaghman-
basketghusinggh6x19ghwireghrope,ghtheghminimumghsafetyghfactorghis? 7
Whatghisghtheghsafetyghfactorghrequiredghwhenghusingghnonghrotatingghwireghropeghandghliftingghpersonnelghi
nghaghman-basket? 10
Whoghhasghtheghresponsibilityghforghdeterminingghtheghcorrectghweightghofghaghload? Supervisor
Whenghworkingghnearghpowerghlines,ghwhenghisghaghsignalghpersonghrequired?
Whenghcraneghmovesghwithinghaghboom'sghlengthghofghpowerghlines.
Whenghanghoperatorghleavesghtheghcrane,ghheghmustghfirst:
Putghtheghloadghonghtheghgroundghandghputghallghdogsghorghpawlsghin.
Ifghreplacingghtheghhoistghlineghwireghropeghonghaghcrane,ghhowghdoghyoughdetermineghtheghsizeghofghtypeghofgh
wireghropeghtoghuse? UseghManufacturer'sghoperatorsghmanualghorghloadghchart.
Afterghtheghcraneghhasghbeenghcheckedghoutghandghbeforeghcraneghliftghoperationsghbegin,ghtheghcrewghshoul
d: Haveghaghpre-liftghmeeting
AccordingghtoghANSIghB30.5ghpersonnelghplatformghliftsghshouldghnotghbeghmadeghwithghwindghinghexcessg
hof: 20ghmph
Whenghisghitghsafeghtoghworkghcloserghthanghtheghallowableghdistanceghfromghpowerghlines?
Whenghutilityghcompanyghsayghtheghlinesghareghde-energized

Document information

Uploaded on
September 7, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
33
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions