Scope - answer--The deliverables or work products that must be completed in order to achieve the project's MOV.
-Provides a boundary so that what needs to get done - gets done.
-Otherwise, schedule and budget are increased for no reason
-Defines what is part of the project team's work and what is not.
-This also sets expectations for all of the project's stakeholders
-Provides a link between the project's MOV and the project plan.
Project Planning Framework - answer-
Project Management Process - answer-Scope Planning
Scope Definition
Create Work Breakdown Structure
Scope Verification
Scope Change Control
Scope Planning - answer-The development of a scope management plan that defines the project's scope and how it will be verified and controlled throughout the project. Scope Management Plan
Scope Definition - answer-A detailed scope statement that defines what work will and will not be part of the project and will serve as a basis for all future project decisions. Detailed Project Scope
Create Work Breakdown Structure - answer-The decomposition or dividing of the major project deliverables into smaller and more manageable components; an important tool that ties the project's scope to resources and activities. The WBS represents a logical decomposition of the work to be performed and focuses on how the product, service, or result is naturally subdivided. It is an outline of what work is to be performed.
WBS
Scope Verification - answer-Confirmation and formal acceptance that the project's scope is accurate, complete, and supports the project's MOV. Scope Verification Checklist
Scope Change Control - answer-Ensuring that controls are in place to manage proposed scope changes once the project's scope is set; helps the project achieve its MOV. These procedures must be communicated to all project stakeholders. Scope Change Control Process (Scope Change Request Form/Scope Change Request Log)
Project Scope Initiation & Planning - answer-A beginning process that formally authorizes the project manager and team to develop the scope management plan
This entails:
Conceptualizing the Scope Boundary
Developing the Scope Statement
Scope Boundary - answer-The first step to establishing what is, and what is not, part of the project work to be completed by the project team (fence designed to keep some things in (supports MOV) and other things out (does not support MOV))
Scope Management Plan - answer-the processes and techniques for defining and managing scope
Scope Statement - answer-Provides a way to define the scope boundary.
A narrative of what deliverables or work-products the project team will and will not provide throughout the project.
A first step that provides a high-level abstraction of the project's scope that will be defined in greater detail as the project progresses.
Project Scope Definition - answer-Where deliverables can be divided into project- oriented deliverables and product- oriented deliverables.
Project-Oriented Scope - answer-Deliverables that support the project management and IT development processes defined in the Information Technology Project Methodology (ITPM).
Examples:
Business case, project charter and project plan, etc.
Definition Tools: DDT & DSC
Deliverable Definition Table (DDT) - answer-define all of the project- oriented deliverables to be provided by the project team.
Deliverable Structure Chart (DSC) - answer-can be developed as an interim step to define detailed work packages that will be used to estimate the project schedule and budget (used to create WBS)
Product-Oriented Scope - answer-High-level features and functionality of the application system
First cut for requirements definition that will be defined in greater detail during the systems development life cycle (SDLC)
Examples
Add new customer, look up customer balance, print daily sales report by region, etc.
Definition Tools: DFD & UCD
(Context) Dataflow Diagram (DFD) - answer-modeling tool for refining the scope boundary and defining what the system must do
Use Case Diagram - answer-a powerful tool for identifying the main functions or features of the system and the different users or external systems that interact with the system; used in OO world as a part of Unified Modeling Language (UML)
Scope Verification - answer-Ensures:
That the project's scope is well-defined, accurate and complete
The project's scope is acceptable to the project stakeholders
That standards exist so that the project's scope will be completed correctly
That the project's MOV will be achieved if the project scope is completed
Tools: Scope Verification Checklist
Scope Verification Checklist - answer-MOV
Deliverables
Quality Standards
Milestones
Review and Acceptance
Scope Change Control - Mitigates - answer-Scope Grope
Scope Creep
Scope Leap
Scope Grope - answer-metaphor that describes a project team's inability to define the project's scope.
Use Case - answer-depicts the major functions the system must perform for an actor or actors.
JAD - answer-a group- based method where the users and systems analysts jointly define the system requirements or design the system (Joint Application Development)
Scope Creep - answer-refers to increasing featurism, adding small yet time- and resource- consuming features to the system once the scope of the project has been approved.
Scope Leap - answer-scope leap sug-gests a fundamental and significant change in the project scope (changes MOV; happens as a result of changes in the environment, the business, and the competitive makeup of the industry)
Project Time Management - answer-focuses on the processes necessary to develop the project schedule and to ensure that the project is completed on time.
Activity definition
Activity sequencing
Activity duration estimation
Schedule development
Schedule control
Activity definition - answer-Identifying what activities must be completed to produce the project scope deliverables
Activity sequencing - answer-Determining whether activities can be completed sequentially or in parallel and any dependencies that may exist among them
Activity resource estimation - answer-Identifying the type of resources ( people, tech-nology, facilities, etc.) and the quantity of resources needed to carry out project activities
Activity duration estimation - answer-Estimating the time to complete each activity
Schedule development - answer-Based on the availability of resources, the activities, their sequence, and time estimates, a schedule for the entire budget can be developed
Schedule control - answer-Ensuring that proper processes and procedures are in place in order to control changes to the project schedule
Work Package - answer-
Work Package (def) - answer-smaller components and more manageable units of work of the project decomposed or subdivided by the WBS
Milestone - answer-a significant event or achievement that provides evidence that that deliverable has been completed or that a phase is formally over.
cruxes - answer-proof of concepts
Deliverables - answer-Tangible, verifiable work products
Reports, presentations, prototypes, etc.
Milestones (key components) - answer-Significant events or achievements
Acceptance of deliverables or phase completion
Cruxes (proof of concepts)
Quality control
Keeps team focused
Developing the WBS - answer-The WBS Should Be Deliverable-Oriented
The WBS Should Support the Project's MOV
Ensure WBS allows for the delivery of all the project's deliverables as defined in project scope
100 percent rule
The Level of Detail Should Support Planning and Control
Developing the WBS Should Involve the People Who Will Be Doing the Work
Learning Cycles and Lessons Learned Can Support the Development of a WBS
Estimation Techniques
- The Project Management Approach - answer-Guesstimating
Delphi Technique
Time Boxing
Top-Down
Bottom Up
Analogous Estimates (Past experiences)
Parametric Modeling (Statistical)
Guesstimating - answer-Based on feeling not facts
Not a good method for estimating but often used by inexperienced project managers
Delphi Technique - answer-Involves multiple, anonymous experts
Each expert makes an estimate
Estimates compared:
If close, can be averaged
Else do another iteration until consensus is reached
Time Boxing - answer-A "box" of time is allocated for a specific Activity or task or deliverable
Can focus a team if used effectively
Can demoralize a team if used too often or ineffectively because of the increased stress or pressure on the project team to get things done
Top-Down Estimating - answer-Top & middle managers determine overall project schedule &/or cost
Lower level managers are expected to breakdown schedule/budget estimates into specific activities (WBS)
Often couched in terms of what a project should cost and how long it should take as decreed by a member of top management who thinks those parameters are appropriate.
May be a response to the business environment
May lead to a death march project.
Bottom-Up Estimating - answer-Most common form of project estimation
Schedules & budgets are constructed from the WBS
Starts with people who will be doing the work
Schedules & budgets are the aggregate of detailed activities & costs
Analogous estimating - answer-based on similarity between current projects and others.
Use information from previous, similar projects as a basis for estimation
Parametric Modeling - answer-Use project characteristics (parameters) in a mathematical model to estimate
Example: $50/ LOC based on:
Programming language
Level of expertise
Size & complexity
Project Estimation -
Software Engineering Approaches - answer-Lines of Code (LOC)
Function Points
COCOMO
Heuristics
Determinants of Estimating the Largest Deliverable of the Project - The Application System - answer-
Lines of Code (LOC) - answer-An often used metric for determining the size of the project
Most controversial
Count comments?
Declaring variables?
Efficient code vs. code bloat
Language differences
Easier to count afterwards than to estimate before programming begins
Function Point Analysis - answer-are a synthetic metric, similar to ones used every day, such as hours, kilos, tons, nautical miles, degrees Celsius, and so on. However, function points focus on the functionality and complexity of an application system or a particular module.
Allan Albrecht, IBM - 1979
Independent of the Technology
IFPUG standards ()
COCOMO - answer-COnstructive COst MOdel
Parametric Model developed by Barry Boehm in 1981
Project types
Organic
Routine projects where the work is expected to go smoothly with few problems
Embedded
Challenging projects that may be new ground for the organization or project team
Semi-detached
In between organic and embedded. Projects that may not be simple and straightforward, but there is a high degree of confidence that the project team can meet the challenge
COCOMO Models (Calculate Effort) - answer-Organic - Routine
Person Months = 2.4 * KDSI1.05
Embedded - Challenging
Person Months = 3.6 * KDSI1.20
Semi-Detached - Middle
Person Months = 3.0 * KDSI1.12
COCOMO Models (Calculate Duration) - answer-Organic
Duration = 2.5 * Effort0.38
Semi-Detached
Duration = 2.5 * Effort0.35
Embedded
Duration = 2.5 * Effort0.32
COCOMO Model Types - answer-Basic
Intermediate
Advanced
COCOMO II
Heuristics
(Rules of Thumb) - answer-1/3 - Planning
1/6 - Coding
1/4 - Component test and early system test
1/4 - System test, all components in hand
Some Examples of Heuristics from Estimating Software Costs by Capers Jones (1988) - answer-Each formal design inspection will find and remove 65 percent of the bugs present.
Each formal code inspection will find and remove 60 percent of the bugs present.
Function points raised to the 0.4 power predict the approximate development schedule in calendar months.
Function points divided by 150 predict the approximate number of personnel required for the application.
What Is the Best Way to Estimate IT Projects? - answer-Use more than one technique for estimating
If estimates from different techniques close, average them
Adjust estimate based on experience
Negotiation may lead to unrealistic estimations
Delphi Techniques - answer-involves multiple experts who arrive at a consensus on a particular subject or issue. Although the Delphi technique is generally used for group decision making, it can be a useful tool for estimating when the time and money warrant the extra effort
1
Content preview
Information Technology Project Management
Scope - answer--The deliverables or work products that must be completed in order to achieve
the project's MOV.
-Provides a boundary so that what needs to get done - gets done.
-Otherwise, schedule and budget are increased for no reason
-Defines what is part of the project team's work and what is not.
-This also sets expectations for all of the project's stakeholders
-Provides a link between the project's MOV and the project plan.
Project Planning Framework - answer-
Project Management Process - answer-Scope Planning
Scope Definition
Create Work Breakdown Structure
Scope Verification
Scope Change Control
Scope Planning - answer-The development of a scope management plan that defines the project's
scope and how it will be verified and controlled throughout the project. Scope Management Plan
Scope Definition - answer-A detailed scope statement that defines what work will and will not be
part of the project and will serve as a basis for all future project decisions. Detailed Project Scope
Create Work Breakdown Structure - answer-The decomposition or dividing of the major project
deliverables into smaller and more manageable components; an important tool that ties the
project's scope to resources and activities. The WBS represents a logical decomposition of the
work to be performed and focuses on how the product, service, or result is naturally subdivided.
It is an outline of what work is to be performed.
WBS
Scope Verification - answer-Confirmation and formal acceptance that the project's scope is
accurate, complete, and supports the project's MOV. Scope Verification Checklist
Scope Change Control - answer-Ensuring that controls are in place to manage proposed scope
changes once the project's scope is set; helps the project achieve its MOV. These procedures
must be communicated to all project stakeholders. Scope Change Control Process (Scope
Change Request Form/Scope Change Request Log)
Project Scope Initiation & Planning - answer-A beginning process that formally authorizes the
project manager and team to develop the scope management plan
This entails:
Conceptualizing the Scope Boundary
, Developing the Scope Statement
Scope Boundary - answer-The first step to establishing what is, and what is not, part of the
project work to be completed by the project team (fence designed to keep some things in
(supports MOV) and other things out (does not support MOV))
Scope Management Plan - answer-the processes and techniques for defining and managing scope
Scope Statement - answer-Provides a way to define the scope boundary.
A narrative of what deliverables or work-products the project team will and will not provide
throughout the project.
A first step that provides a high-level abstraction of the project's scope that will be defined in
greater detail as the project progresses.
Project Scope Definition - answer-Where deliverables can be divided into project- oriented
deliverables and product- oriented deliverables.
Project-Oriented Scope - answer-Deliverables that support the project management and IT
development processes defined in the Information Technology Project Methodology (ITPM).
Examples:
Business case, project charter and project plan, etc.
Definition Tools: DDT & DSC
Deliverable Definition Table (DDT) - answer-define all of the project- oriented deliverables to
be provided by the project team.
Deliverable Structure Chart (DSC) - answer-can be developed as an interim step to define
detailed work packages that will be used to estimate the project schedule and budget (used to
create WBS)
Product-Oriented Scope - answer-High-level features and functionality of the application system
First cut for requirements definition that will be defined in greater detail during the systems
development life cycle (SDLC)
Examples
Add new customer, look up customer balance, print daily sales report by region, etc.
Definition Tools: DFD & UCD
(Context) Dataflow Diagram (DFD) - answer-modeling tool for refining the scope boundary and
defining what the system must do
Use Case Diagram - answer-a powerful tool for identifying the main functions or features of the
system and the different users or external systems that interact with the system; used in OO
world as a part of Unified Modeling Language (UML)
Scope Verification - answer-Ensures:
That the project's scope is well-defined, accurate and complete