Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Ohio Lead Abatement contractor test questions and answers

Document preview thumbnail
Preview 2 out of 11 pages

PPb parts per billion PEL permissible exposure limits: developed by OSHA to indicate the max airborne concentration of a contaminant to which an employee may be exposed over the duration specified by the type of PEL. Ug microgram 30 ug The level of action Hud recommends temporary relocation of residence for jobs lasting more than? 5 conservative days When dust and debris spread beyond blank feet follow high dust methods 6 feet Post warning signs on the building and at a blank perimeter around building less if distance to next building or sidewalk is less than 20 feet Workers must clean when leaving the work area with ? Heap vac Children shall not have access to protective sheeting because Suffocation Hazards Do not conduct work if wind speeds are greater than ____ per hour. If dust and debris can't be adequately contained. 20 ug/ft2 microgram per foot square (dust sampling) ppm (parts per million) parts per million by weight Ppb parts per billionby weight 1,000 = 1 ppm ug/g microgram per gram 30 ug Action Level 40 Ug Allowable blood 50ug Permissible exposure limit Water action level 15 ppb Blood is measured in Deciliter 3 types of specs Performance, means, method Allows you to go less then Federal Requirements Vertical Containment OSHA base everything on? 8 hours twa Twa Time Weighted Average Three Stages 1. Special Cleaning ing and resealing 3. Hepa/wet wash/hepa again OSHA requires cleaning how often Daily Label large debris in 6 mil poly final clearance Floors 10 ug Final Clearance Window sills 100 Window troughs 400 ug TCLP Toxicity Characteristic Leaching Procedure Hazardous waste disposal Licensed disposal site special container muse licensed transporter Mg/cm2

Content preview

Ohio Lead Abatement Contractor Test Questions And Correct Answers... file:///C:/Users/Pavilion/Desktop/New%20folder%20(4)/Ohio%20L




Ohio Lead Abatement Contractor Test Questions And



Correct Answers 2024/2025



1. PPb: parts per billion



2. PEL: permissible exposure limits: developed by OSHA to indicate the max air-



borne concentration of a contaminant to which an employee may be exposed



overthe duration specified by the type of PEL.



3. Ug: microgram



4. 30 ug: The level of action



5. Hud recommends temporary relocation of residence for jobs lasting more



than?: 5 conservative days


1/3




1 of 11 30/08/2024, 18

,Ohio Lead Abatement Contractor Test Questions And Correct Answers... file:///C:/Users/Pavilion/Desktop/New%20folder%20(4)/Ohio%20L




6. When dust and debris spread beyond blank feet follow high dust methods: 6



feet



7. Post warning signs on the building and at a blank perimeter around building



less if distance to next building or sidewalk is less than: 20 feet



8. Workers must clean when leaving the work area with ?: Heap vac



9. Children shall not have access to protective sheeting because: Suffocation



Hazards



10. Do not conduct work if wind speeds are greater than per hour. If dust



and debris can't be adequately contained.: 20



11. ug/ft2: microgram per foot square (dust sampling)



12. ppm (parts per million): parts per million by weight


2/3




2 of 11 30/08/2024, 18

Document information

Uploaded on
September 5, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTUREHELLEN
3.9
(34)
Sold
208
Followers
161
Items
3336
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions