productivity.
/.Access to under-floor spaces - Answer-Minimum size and location of openings for
under-floor access
/.Anchoring of exterior facilities - Answer-Methods for anchoring exterior facilities to
primary structures
/.Anchoring of wood sole plate - Answer-Wood sole plate at exterior walls on monolithic
slabs must be anchored with anchor bolts spaced a maximum of 6 feet on center.
/.Bathroom ceiling height - Answer-Bathrooms must have a minimum ceiling height of 7
feet at the center of the fixture clearance area.
/.Bracing determination for buildings - Answer-Method of determining bracing
requirements based on building layout
/.Cantilever back-span joists extension - Answer-Doubled cantilever back-span joists in
cold-formed steel framed floors must extend a minimum of 4 feet within the building.
/.Ceiling joist span for attics - Answer-For SS Douglas fir-larch 2X8 joists spaced 19.2
inches OC, the maximum span in uninhabitable attics without storage is 24-0.
/.Ceiling projections in basements - Answer-Ceilings in basements without habitable
spaces may project to within 6 feet 10 inches of the finished floor.
/.Certification Exam Details - Answer-Specifications for the ICC Residential Building
Inspector exam.
/.Cleanout openings in masonry chimneys - Answer-Requirement for cleanout openings
near the base of flues
/.Code arrangement - Answer-Organization of the code book for quick information
retrieval
/.Code book index - Answer-Alphabetical listing of topics for locating specific information
/.Code Book Structure - Answer-Understanding the organization and layout of the code
book.
, /.Code skimming - Answer-Quick reading to grasp the overall structure of the code book
/.Cold formed steel joist placement - Answer-Permitted location for cold formed steel
floor cantilevered joists
/.Construction basis for light frame buildings - Answer-Basis of requirements for light
frame building construction
/.Construction documents - Answer-Documents required for permit application,
prepared by a licensed architect or engineer as per jurisdiction statutes.
/.Construction Documents - Answer-Submission requirements for permit applications,
including site plans.
/.Continuous studs requirement - Answer-Specification for studs to resist loads
perpendicular to walls
/.Corrosion-resistant flashing definition - Answer-Definition of flashing integrated into
building walls
/.Egress door operability - Answer-Egress doors must be readily openable without the
use of a door knob, panic hardware bar, or special effort.
/.Emergency equipment repairs - Answer-In emergency equipment repairs, the permit
application must be submitted within the next working business day.
/.Emergency escape opening requirement - Answer-Emergency escape openings below
ground elevation must be provided with a window well.
/.Emergency escape openings operation - Answer-Criteria for operational emergency
escape openings
/.Excavation scope for footings - Answer-Inclusions in the scope of excavation for
footings
/.Exhaust air direction restriction - Answer-Prohibition on directing exhaust air to specific
locations
/.Exterior stairway illumination control - Answer-Location of control for exterior stairway
illumination
/.Fences permit exemption height - Answer-Fences under 4 feet high are exempt from
permit requirements.