• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Test| Questions and 100% Correct Answers| Latest Update

Document preview thumbnail
Preview 3 out of 16 pages

ACI Concrete Field Testing Technician- Grade I Test| Questions and 100% Correct Answers| Latest Update

Content preview

ACI Concrete Field Testing Technician-
Grade I Test| Questions and 100% Correct
Answers| Latest Update

The mold for making the slump test is in the shape of _____. - ANSWER The frustum of a cone


The height of the slump mold is _____. - ANSWER 12 in. [300 mm]



The interior surface of the slump mold is allowed to have minor irregularities. True or False?
- ANSWER False


For use in the slump test, the end or both ends of the tamping rod must be _____. - ANSWER
Rounded to a hemispherical tip



The sample of concrete for use in making the slump test must be obained in accordance with
ASTM Standard _____. - ANSWER C172, Standard Practice for Sampling Freshly Mixed Concrete



The slump mold should be in a dry condition before beginning the test. True or False?
- ANSWER False


The surface on which the slump mold will be placed must be _____. - ANSWER Flat, level, moist,
nonabsorbent, and free of vibration


The slump mold is filled in _____ layers. - ANSWER 3


Each layer should fill approximately _____ the volume of the mold. - ANSWER One-third

,The approximate concrete depth (in verticle distance) after placing the first layer is _____, and
the second layer is _____. - ANSWER 2 5/8 in. [70 mm], 6 1/8 in. [160 mm]


What is the specified number of roddings for each layer? - ANSWER 25



How deep should the tamping rod penetrate into each layer? - ANSWER Rod each layer
throughout its depth; on the second and final layers, the rod should penetrate into the previous
layer approximately 1 in. [25 mm]


When rodding the bottom layer, the tamping rod must be _____ to uniformly distribute the
strokes. - ANSWER Slightly inclined



What must be done if the concrete drops below the top of the slump mold while the top layer
is being rodded? - ANSWER Add additional concrete to keep an excess of concrete above the
top of the mold at all times


Prior to lifting the mold, concrete must be removed from _____. - ANSWER The area
surrounding the base of the mold



After the final rodding, the sides of the slump mold should should be tapped lightly with
the tamping rod. True or False? - ANSWER False



When raising the slump mold, it should not be rotated or twisted, True or False? - ANSWER
True


How much time is allowed for lifting the slump mold? - ANSWER 5 +- 2 seconds



The measurement for slump is made from the top of the mold to what point of the concrete
specimen? - ANSWER The displaced original center of the top surface of the specimen

, The slump of the concrete is measured and reported to the nearest _____. - ANSWER 1/4 in. [5
mm]



How much time is allowed to conduct the slump test from beginning to completion? - ANSWER
2 1/2 minutes


The diameter of the tamping rod used in the test method is _____. - ANSWER 5/8 in. [16 mm]



What is the required shape of the tamping end of the rod? - ANSWER Rounded to a
hemispherical tip



What is the required minimum frequency of the vibrator used in this test method? -
ANSWER 7000 vibrations per minute


The outside diameter or side dimension of the vibrating element must be at least _____ but not
greater than _____. - ANSWER 0.75 in. [19 mm], 1.50 in. [38 mm]



A plastic container can be used for the measure in this method. True or False? - ANSWER False,
measure must be steel or another suitable metal


What is the minimum thickness of a metal strike-off plate? - ANSWER 1/4 in. [6 mm]


What is the minimum thickness for a glass or acrylic strike-off plate? - ANSWER 1/2 in. [12 mm]



What is the specified weight of the mallet used on measures that are 0.5 ft^3 [14 L] or smaller?
- ANSWER 1.25 +- 0.50 lb. [600 +- 200 g]


Measures other than air meter bowls used for this test must conform to ASTM _____. -
ANSWER C29

Document information

Uploaded on
September 5, 2024
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
24709
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions