Your agency needs to construct a new high school. What's the difference between using the design-bid-build method versus design-build? Extra credit for explaining CM (construction manager) at risk. - ACCURATE ANSWERS Design-bid-build method = The entity who needs a building constructed, or the project owner, hires a designer to draw up the schematics and plans for the building. The designer can then hire consultants as needed, who report directly to the designer. Once the building is drawn up, the designer is pretty much done with the project outside of consultation and tweaks as needed. With plans in hand, the project owner gets bids from various construction firms to construct the building. The project owner picks the bid they like best and hires the contractor. As with the designer, the contractor can hire subcontractors as needed who would report directly to them, not the project owner. Then, the building is constructed based on the schematics and documents that the designer made. Design-build method = There is only one contract. The person in need of a building, also known as a project owner, hires one person or company to both design and construct the building. This person, known as the design-builder, can hire design consultants and subcontractors as they see fit, but those employees would answer directly to the design-builder, not the project owner. A buyer for a governmental entity ran into the IT director in the break room while having a cup of coffee. The IT director is a new hire from the private sector. He indicated that he was planning a large purchase of external hard drives for use in the various offices. What should the buyer do with this information? - ACCURATE ANSWERS Go back to his office and send the IT director an email recapping the discussion and requesting that he send a requisition with specifications.

Content preview

NIGP – CPP EXAM |GUARANTEED
PASS |VERIFIED WITH ACCURATE
ANSWERS

Your agency needs to construct a new high school. What's the difference
between using the design-bid-build method versus design-build? Extra
credit for explaining CM (construction manager) at risk. - ACCURATE
ANSWERS✔✔ Design-bid-build method = The entity who needs a
building constructed, or the project owner, hires a designer to draw up
the schematics and plans for the building. The designer can then hire
consultants as needed, who report directly to the designer. Once the
building is drawn up, the designer is pretty much done with the project
outside of consultation and tweaks as needed. With plans in hand, the
project owner gets bids from various construction firms to construct the
building. The project owner picks the bid they like best and hires the
contractor. As with the designer, the contractor can hire subcontractors
as needed who would report directly to them, not the project owner.
Then, the building is constructed based on the schematics and
documents that the designer made.


Design-build method = There is only one contract. The person in need of
a building, also known as a project owner, hires one person or company
to both design and construct the building. This person, known as the
design-builder, can hire design consultants and subcontractors as they
see fit, but those employees would answer directly to the design-builder,
not the project owner.


A buyer for a governmental entity ran into the IT director in the break
room while having a cup of coffee. The IT director is a new hire from

,the private sector. He indicated that he was planning a large purchase of
external hard drives for use in the various offices. What should the buyer
do with this information? - ACCURATE ANSWERS✔✔ Go back to his
office and send the IT director an email recapping the discussion and
requesting that he send a requisition with specifications.


Off-the-shelf, commercially available and ready-made are all terms
associated with: - ACCURATE ANSWERS✔✔ Standard Specification


Which of the following options describes an important consideration
when developing a strategic plan? - ACCURATE ANSWERS✔✔ Each
element is aligned with and supports the other elements


The four steps for the strategic planning development include: -
ACCURATE ANSWERS✔✔ 1. Outline the entity's mission, programs,
resources, and support systems.
2. Identify what works well and what needs improved.
3. Identify how improvements should be made and then determine the
best method to make improvements.
4. Include the improvements as strategies in the strategic plan and
connect to the alignment path.


A school district buyer has a mandate from the Board to increase
SWMBE (small, woman-owned, minority-owned business enterprise)
opportunities. Which of the following would be the best step for her to
take in order to do so. - ACCURATE ANSWERS✔✔ Engage DBEs in
procurements which require little or no competition

, LEED provides a point rating system to score green building design and
construction and points are distributed across eight credit categories: -
ACCURATE ANSWERS✔✔ Sustainable Sites - This category measures
the extent to which the entire property is used to mitigate the project's
impact on the site.
Water Efficiency - This category is evaluated by the level in which the
construction project includes water conservation strategies, which may
be inside or outside and build into the structure.
Energy and Atmosphere - This category evaluates the measures taken to
optimize energy efficiency and use of efficient HVAC systems.
Materials and Resources - This category measures the means by which
the amount of wastes may be reduced during the building of the
structure; and selection of sustainable materials.
Indoor Environmental Quality - This category evaluates the planning of
optimal indoor air quality through the planned reduction of air pollution
using energy-efficient appliances and other ventilation measures.
Innovation in Design - This category includes the use of innovative
measures in design and performance through collaborations by all
stakeholders in the building process.
Regional Priority - This category provides credits for construction
planning which addresses challenges, which may be predetermined to be
unique to the region in which the construction is located.
Location and Transportation - This category evaluates the location of the
project and the ease by which stakeholders may travel to and from the
facility once it is completed.

Document information

Uploaded on
September 2, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMLINKS
3.1
(17)
Sold
67
Followers
6
Items
3532
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions