CMP 101 Final EXAM PREP WITH COMPLETE SOLUTION

Content preview

CMP 101 Final EXAM PREP WITH
COMPLETE SOLUTION
As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - =- Hire skilled workers to perform the construction
work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time


For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - =Building and Non-building construction


GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - =General Contractor


On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)

,- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - =- Architect
- Construction Manager


On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - =Excavation for foundation


Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1
- P1 - =None of these


Which of the following discuss the quantity of work to be performed on a proposed
construction project?
- Construction Plans/Drawings
- None of these
- Construction Specifications
- Construction Bid Form - =Construction Plans/Drawings

, Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage
- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation
- Interior Painting - =- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation


During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period
- Procurement Period - =Warranty Period


Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence
- Puranese - =Middle Ages


Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build

Document information

Uploaded on
September 1, 2024
Number of pages
26
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
hurryben
3.0
(1)
Sold
12
Followers
5
Items
1800
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions