As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - =- Hire skilled workers to perform the construction
work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time
For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - =Building and Non-building construction
GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - =General Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)
,- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - =- Architect
- Construction Manager
On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - =Excavation for foundation
Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1
- P1 - =None of these
Which of the following discuss the quantity of work to be performed on a proposed
construction project?
- Construction Plans/Drawings
- None of these
- Construction Specifications
- Construction Bid Form - =Construction Plans/Drawings
, Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage
- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation
- Interior Painting - =- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period
- Procurement Period - =Warranty Period
Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence
- Puranese - =Middle Ages
Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build
COMPLETE SOLUTION
As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment
- Ensure the project is completed on time - =- Hire skilled workers to perform the construction
work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time
For CMP101, what are the 2 types of construction?
- Building and Non-building construction
- Residential and Commercial construction - =Building and Non-building construction
GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction
- None of these - =General Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)
,- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor
- Construction Manager - =- Architect
- Construction Manager
On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation
- Excavation for foundation - =Excavation for foundation
Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1
- P1 - =None of these
Which of the following discuss the quantity of work to be performed on a proposed
construction project?
- Construction Plans/Drawings
- None of these
- Construction Specifications
- Construction Bid Form - =Construction Plans/Drawings
, Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage
- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation
- Interior Painting - =- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period
- Procurement Period - =Warranty Period
Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence
- Puranese - =Middle Ages
Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build