• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

WGU C215 Operations Text Glossary Ch 14 Question and answers 100% correct 2024

Document preview thumbnail
Preview 1 out of 4 pages

WGU C215 Operations Text Glossary Ch 14 Question and answers 100% correct 2024 WGU C215 Operations Text Glossary Ch 14 Action bucket - correct answer The current time period. Action notices - correct answer Output from an MRP system that identifies the need for an action to be taken. Application service provider (ASP) - correct answer Sets up and runs ERP systems. Backward scheduling - correct answer Starts with the due date for an order and works backward to determine the start date for each activity. Bill of material (BOM) - correct answer Lists all the subassemblies, component parts, and raw materials that go into an end item and shows the usage quantity of each required. Capacity requirements planning (CRP) - correct answer Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. Closed-loop MRP - correct answer An MRP system that includes production planning

Content preview

WGU C215 Operations Text Glossary Ch
14
Action bucket - correct answer ✔The current time period.


Action notices - correct answer ✔Output from an MRP system that identifies
the need for an action to be taken.


Application service provider (ASP) - correct answer ✔Sets up and runs ERP
systems.


Backward scheduling - correct answer ✔Starts with the due date for an order
and works backward to determine the start date for each activity.


Bill of material (BOM) - correct answer ✔Lists all the subassemblies,
component parts, and raw materials that go into an end item and shows the
usage quantity of each required.


Capacity requirements planning (CRP) - correct answer ✔Determines the
labor and machine resources needed to fill the open and planned orders
generated by the MRP.


Closed-loop MRP - correct answer ✔An MRP system that includes
production planning, master production scheduling, and capacity requirements
planning


Components - correct answer ✔Raw materials, purchased items, or
subassemblies that are part of a larger assembly.

Document information

Uploaded on
August 31, 2024
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
flyhigher329
3.7
(61)
Sold
386
Followers
175
Items
18498
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions