• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 87 pages
Exam (elaborations)

WGU C215 Operations Management Question and answers 100% correct 2024

Document preview thumbnail
Preview 4 out of 87 pages

WGU C215 Operations Management Question and answers 100% correct 2024 WGU C215 Operations Management -Objective Assessment Prep Guide & Terminologies Combo Study Guide 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality - correct answer Total Quality Management (TQM) Philosophy Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." - correct answer Process Capability Index (Cpk) A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. - correct answer Six Sigma The theoretical maximum output of a system in a given period under ideal conditions. - correct answer Design Capacity The capacity a firm ex

Content preview

WGU C215 Operations Management -
Objective Assessment Prep Guide &
Terminologies Combo Study Guide
1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality - correct answer ✔Total Quality Management
(TQM) Philosophy


Basic function of Six Sigma. Measures the process potential and performance
of processes. The higher the range of Cpk, the improved is the ability of the
process to complete its necessities. Uses both the process variability and the
process specifications to determine whether the process is "capable." - correct
answer ✔Process Capability Index (Cpk)


A disciplined, data-driven approach and methodology for eliminating defects
(driving toward six standard deviations between the mean and the nearest
specification limit) in any process - from manufacturing to transactional and
from product to service. - correct answer ✔Six Sigma


The theoretical maximum output of a system in a given period under ideal
conditions. - correct answer ✔Design Capacity


The capacity a firm expects to achieve given its current operating constraints.
- correct answer ✔Effective Capacity

,proximity to customers, transportation, source of labor, community attitude,
proximity to suppliers, and many other factors. - correct answer ✔Location
Analysis


A type of process used to produce a large volume of a standardized product. -
correct answer ✔Line Processes


A type of process used to produce a small quantity of products in groups or
batches based on customer orders or specifications. - correct answer
✔Batch Processes


A type of process used to make a one-at-a-time product exactly to customer
specifications. - correct answer ✔Project Processes


A type of process that operates continually to produce a high volume of a fully
standardized product. - correct answer ✔Continuous Processes


Longest task in the process. - correct answer ✔Bottleneck


A type of automated system that combines the flexibility of intermittent
operations with the efficiency of continuous operations. - correct answer
✔Flexible Manufacturing System (FMS)


A technique for monitoring the flow of jobs between work centers. - correct
answer ✔Output/Input Control


The net increase created during the transformation of inputs into final outputs.
- correct answer ✔Value-Added

,Layouts that combine characteristics of process and product layouts. - correct
answer ✔Hybrid Layouts


Table that reflects opinions of managers with regard to the importance of
having any two departments close together. - correct answer ✔Relationship
Chart (REL)


The shortest distance between two locations using north-south and east-west
movements. - correct answer ✔Rectilinear Distance


Table that gives the number of trips or units of product moved between any
pair of departments. - correct answer ✔From-To Matrix


Schematic showing the placement of resources in a facility. - correct answer
✔Block Plan


The average of the observation times for each of the work elements. - correct
answer ✔Mean Observed Times


The mean observed time multiplied by the performance rating factor by the
frequency of occurrence. - correct answer ✔Normal Time


The length of time it should take a qualified worker using appropriate process
and tools to complete a specific job, allowing time for personal fatigue and
unavoidable delays. - correct answer ✔Standard Time


A philosophy designed to achieve high-volume production through elimination
of waste and continuous improvement. Based on a "pull" system rather than a

, "push" system. The three elements are just-in-time manufacturing, total quality
management, and respect for people. - correct answer ✔Just-in-Time (JIT)


A card that specifies the exact quantity of product that needs to be produced. -
correct answer ✔Kanban card


A philosophy of neverending improvement. - correct answer ✔Continuous
Improvement


Supplies materials or services directly to the processing facility. - correct
answer ✔Tier One Suppliers


Directly supplies materials or services to a tier one supplier in the supply
chain. - correct answer ✔Tier Two Suppliers


Directly supplies materials or services to a tier two supplier in the supply
chain. - correct answer ✔Tier Three Suppliers


Management of the flow of materials from suppliers to customers in order to
reduce overall cost and increase responsiveness to customers. - correct
answer ✔Supply Chain Management (SCM)


Determines the labor and machine resources needed to fill the open and
planned orders generated by the MRP. - correct answer ✔Capacity
Requirements Planning (CRP)


A system that uses the MRP, inventory record data, and BOM to calculate
material requirements. - correct answer ✔Material Requirements Planning
(MRP)

Document information

Uploaded on
August 31, 2024
Number of pages
87
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
flyhigher329
3.7
(61)
Sold
386
Followers
175
Items
18498
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions