lean bronze obi
2024 latest
update(solved)
AQL
Acceptable Quality Level
A3 Report
plan do check act
andon
stop the line
cell
adjacent and inorder
deshi
student
dojo
training hall
fishbone diagram
cause and effect diagram 1 of 7 quality tools
Total productive maintenance
, maximizing equipment measuring the big six
losses
value steam
steps required to bring a product to customer
work in progress
between machines waiting to b processed
yokoten
infomation sharing across the plant
conformance
judgment that a product or service has met
requirements of a relevant specification
control chart
chart with upper and lower limit based off of
statistics
cost
managing various resources properly and
eliminating waist
cross functional management
interdepartmental management activity
cycle time
actual time to process a product
delivery
the delivery and quantity
failure tree analysis
2024 latest
update(solved)
AQL
Acceptable Quality Level
A3 Report
plan do check act
andon
stop the line
cell
adjacent and inorder
deshi
student
dojo
training hall
fishbone diagram
cause and effect diagram 1 of 7 quality tools
Total productive maintenance
, maximizing equipment measuring the big six
losses
value steam
steps required to bring a product to customer
work in progress
between machines waiting to b processed
yokoten
infomation sharing across the plant
conformance
judgment that a product or service has met
requirements of a relevant specification
control chart
chart with upper and lower limit based off of
statistics
cost
managing various resources properly and
eliminating waist
cross functional management
interdepartmental management activity
cycle time
actual time to process a product
delivery
the delivery and quantity
failure tree analysis