PJM Generation Dispatcher UPDATED Exam Questions and CORRECT Answers An EXCITER on a traditional generator does what? - Correct Answer- Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct Answer- Limits When synchronizing to the interconnection, what needs to be synchronized? - Correct Answer- Frequency, Voltage, and phase angle

Content preview

PJM Generation Dispatcher UPDATED
Exam Questions and CORRECT Answers

An EXCITER on a traditional generator does what? - Correct Answer- Voltage regulation
(AVR) if you change the excitation current, you change the voltage.


ECO Min, ECO Max, and EMERG Max are genrator _________________. - Correct
Answer- Limits


When synchronizing to the interconnection, what needs to be synchronized? - Correct
Answer- Frequency, Voltage, and phase angle.


GMD (GeoMagnetic Disturbance) procedure is implemented when? - Correct Answer- 10A
or greater is measured by special equipment at Missouri Ave or Meadowbrook and the
measurement is confirmed by one of the following other sources: Excess transformer current
@ Meadowbrook, Beddington, Donbs, or Black Oak, high MVAR requirements on
transformers @ Hopw Creek or Salem nuclear subs, or high DC measurements @ Limerick
or Peach Bottom.


What are the 2 types of National Terrorism Advisory Alerts? - Correct Answer- Elevated and
Imminent.


What action does PJM take for a terrorist attack, fuel delivery emergency, or GMD's? -
Correct Answer- Conservative Operations


What does PJM put the most emphasis on during a terrorist/sabotage event? - Correct
Answer- Operations and Communications


What does PJM request during a low voltage alert? - Correct Answer- RRC - reactive reserve
check


PJM issues a Heavy Load Voltage Warning how many hours prior to implementation? -
Correct Answer- 4 hours

, What should generation owners/operators do during a High System Voltage Action? - Correct
Answer- Operate at the lower bandwidth of the voltage schedule.


How many hours do you have to report a 24-hr reportable NERC disturbance? - Correct
Answer- 6 hours


What report is generated during a Max Emergency Gen Alert? - Correct Answer- SSR -
Supplementary Status Report


What part of the SSR is the Fuel Limited Resources accounted for? - Correct Answer- Part G
Resource Limited Units which are units that are not able to run at max capacity for more than
72 hours.


What kind of Emergency Procedures occur during real time operating hours? - Correct
Answer- Actions


What is the per Unit (p.u.) for a 345 kV nominal voltage that is currently at 348 kV? - Correct
Answer- 348/345 = 1.008 pu


What is the Emergency Reducible Generation (ERG) if the Eco Min is 100 and the
Emergency Min is 75? - Correct Answer- Eco Min - Emerg Min = 25MW


How many Black Start units are required for critical load/TO zone? - Correct Answer- 2
Black Start units


What is the minimum amount of hours for fuel supply for Black Start units? - Correct
Answer- 10 hours, must notify PJM when it reaches that level.


Regulation must be attainable within how many minutes? - Correct Answer- 5


ACE - Area Control Error is used to balance what 2 things? - Correct Answer- Generation
and Load


If your ACE in your control area is -1500, what would you do? - Correct Answer- 100%
spinning (synchronized) reserves

Document information

Uploaded on
August 22, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions