After completing preliminary tasks, the HACCP team will need to work on the initial plan by:
✔️Following the HACCP principles
Which of the following is not included in the corrective action principle?
- Record the corrective actions that have been taken
- Create a sampling protocol
- Determine and correct the cause of non-compliance
- Determine the disposition of non-compliant product
✔️Create a sampling protocol
Using the first principle, the team conducts a hazard analysis and identifies appropriate __________
measures.
✔️Preventive
Successful implementation of the HACCP plan depends upon the commitment of:
✔️Top management
People working on the HACCP plan are responsible for:
✔️Developing, implementing, and maintaining the HACCP plan
Thermal processing and chilling are examples of:
✔️Critical control points
Visual observations, pH, and moisture levels are examples of:
✔️Monitoring activities