• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

ARE 366 Exam 2 Practice Questions and Answers (100% Pass)

Document preview thumbnail
Preview 2 out of 15 pages

ARE 366 Exam 2 Practice Questions and Answers (100% Pass)

Content preview

©PREP4EXAMS@2024 [REAL-EXAM-DUMPS] Wednesday, July 31, 2024 9:10 AM




ARE 366 Exam 2 Practice Questions and Answers (100% Pass)


Contract Modification - ✔️✔️Modification of existing contract clause or detail


Contract change - ✔️✔️Differing contract inclusion that has not yet been accepted by one

or both parties


Canons of contract interpretation - ✔️✔️1. Handwritten is more powerful than print


2. Specific is more powerful than general


3. -----------------------------------------


Spearin Doctrine - Favors Contractors - ✔️✔️1. Contractor should worry about following

instructions, bot analyzing drawings/specs


2. Contractors are not liable for design defects if all plans/specs are followed exactly as

recieved


Spearin Doctrine - Favors Owners - ✔️✔️1. -------------------------------------


2. ------------------------------------


Progress payments are based upon: - ✔️✔️1. -----------------------------------


2. Quality Checks


3. Contractual Requirements & what was agreed upon in contract




1

, ©PREP4EXAMS@2024 [REAL-EXAM-DUMPS] Wednesday, July 31, 2024 9:10 AM



Legal Defense Claims in court - ✔️✔️1. ----------------------------


2. ---------------------------


3. ---------------------------


Basic principles regarding design work and responsibility - ✔️✔️1. The contractor must

follow drawings and specs as outlined by A/E


2. Must communicate with A/E on any design clarification issues


Why do government contracts include a differing site conditions clause? - ✔️✔️1.

Geotech reports can be wrong


2. Site conditions are not entirely known


3. --------------------------------


To prove Constructive Acceleration, a contractor must prove: - ✔️✔️1. Acceleration

caused productivity loss


2. There was a delay not comitted by contractor


3. Notice requirements were followed


4. There was negotiation, mediation, and attempt to prevent acceleration


5. Show time extension was requested


6. Request was denied


Advantages of Dispute Review Boards - ✔️✔️1. Less costly than court



2

Document information

Uploaded on
August 14, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaWest
2.7
(23)
Sold
119
Followers
17
Items
8334
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions