JACKLINE
CEPSCI With 100% ACCURATE QUESTIONS AND ANSWERS ALREADY
GRADED A+ Pre
Terms in this set (72)
NPDES National Pollutant Discharge Elimination System
Clean Water Act Administered by the EPA in 1972
Water Quality Act Amendment to CWA in 1987 to regulate storm water discharges under NPDES program
Point Source Pollution Discharges from readily identifiable sources like treatment plants
Nonpoint Source Solution Runoff from urbanized or agricultural areas
NPDES in South Carolina SC is a delegated state. Regulations are administered by SCDHEC
CGP Phase II Construction General Permit effective on September 1, 2006
NPDES Permit Coverage 1 or more acres of land disturbance. Within 1/2 mile of a receiving water body in SC Coastal Zone
CGP Requirements for OCRM Coverage granted 7 days after DHEC receives NOI
CGP Requirements for SCDOT Coverage granted 10 days after DHEC receives NOI
CGP Requirements for DHEC Coverage granted 20 days after DHEC receives completed NOI
NOI Notice Of Intent
, Storm Water Pollution Prevention Plan, Completed prior to filing NOI, Prepared in accordance with
SWPPP
Phase II CGP
Identification of operators
Sequence of construction
SWPPP Requirements
Locations of all BMP's
Locations of all surface waters of state
Must be in compliance with all other permits
Must comply with Federal reporting requirements
CGP Filing
File NOT when construction is complete
Retain documentation 3 years.
10 or more acres
Pre Construction meeting Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must be present
Co-permittees certify that are responsible for control of the SWPPP and have participated in a Pre-
Con meeting
Contractor Certification
All Contractors that are not co-permittees must certify accountability to DHEC and a Pre-Con
meeting
EPSC Inspector Qualifications Individuals certified by a DHEC approved course.
(A) At least once every 7 days, or
(B) At least once every 14 days and within 24 hours of the end of a storm event of 0.5 inches or
Inspection Frequency
greater
(C) Once a month if entire site is temporarily stabilized
All areas disturbed by construction activities
Areas used for materials storage exposed to precipitation
Sediment/Erosion control structures in SWPPP
Inspection Locations
All discharge locations
Nearby downstream locations
Constuction entrances
CEPSCI With 100% ACCURATE QUESTIONS AND ANSWERS ALREADY
GRADED A+ Pre
Terms in this set (72)
NPDES National Pollutant Discharge Elimination System
Clean Water Act Administered by the EPA in 1972
Water Quality Act Amendment to CWA in 1987 to regulate storm water discharges under NPDES program
Point Source Pollution Discharges from readily identifiable sources like treatment plants
Nonpoint Source Solution Runoff from urbanized or agricultural areas
NPDES in South Carolina SC is a delegated state. Regulations are administered by SCDHEC
CGP Phase II Construction General Permit effective on September 1, 2006
NPDES Permit Coverage 1 or more acres of land disturbance. Within 1/2 mile of a receiving water body in SC Coastal Zone
CGP Requirements for OCRM Coverage granted 7 days after DHEC receives NOI
CGP Requirements for SCDOT Coverage granted 10 days after DHEC receives NOI
CGP Requirements for DHEC Coverage granted 20 days after DHEC receives completed NOI
NOI Notice Of Intent
, Storm Water Pollution Prevention Plan, Completed prior to filing NOI, Prepared in accordance with
SWPPP
Phase II CGP
Identification of operators
Sequence of construction
SWPPP Requirements
Locations of all BMP's
Locations of all surface waters of state
Must be in compliance with all other permits
Must comply with Federal reporting requirements
CGP Filing
File NOT when construction is complete
Retain documentation 3 years.
10 or more acres
Pre Construction meeting Explain SWPPP to all co-permittees
Contractors that are not co-permittees and the preparer must be present
Co-permittees certify that are responsible for control of the SWPPP and have participated in a Pre-
Con meeting
Contractor Certification
All Contractors that are not co-permittees must certify accountability to DHEC and a Pre-Con
meeting
EPSC Inspector Qualifications Individuals certified by a DHEC approved course.
(A) At least once every 7 days, or
(B) At least once every 14 days and within 24 hours of the end of a storm event of 0.5 inches or
Inspection Frequency
greater
(C) Once a month if entire site is temporarily stabilized
All areas disturbed by construction activities
Areas used for materials storage exposed to precipitation
Sediment/Erosion control structures in SWPPP
Inspection Locations
All discharge locations
Nearby downstream locations
Constuction entrances