• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

CEPSCI Exam Study Materials With questions and 100% ALL SURE ANSWERS

Document preview thumbnail
Preview 2 out of 5 pages

CEPSCI Exam Study Materials With questions and 100% ALL SURE ANSWERS

Content preview

JACKLINE


CEPSCI Exam Study Materials With questions and 100% ALL SURE Pre

ANSWERS

Terms in this set (29)

Sediment control structures such as silt fence most a. Slowing water to allow sediment particles to settle out.
commonly trap sediment by the following means:


a. Slowing water to allow sediment particles to
settle out.
b. Serving as a filter that traps sediment particles in
the small openings.
c. Preventing on-site erosion.
d. Serving as obstacles for vehicular traffic to slow
movement.

PAM is a chemical that is added to turbulent runoff b. Cause flocculation that reduces sediment transport.
primarily to achieve the following:


a. Change the turbulent flow to laminar flow.
b. Cause flocculation that reduces sediment
transport.
c. Make the water potable immediately.
d. Provide binding of seed to mulch so that
vegetation can be established.

, Energy dissipation is an important function for each d. Construction entrance
of the following BMPs except:


a. ECBs
b. Mulches
c. Riprap
d. Construction entrance

Filter fabric inlet protection is the most appropriate c. Low (< 0.5 cfs)
BMP of choice in situations where the flow rate is:


a. High (> 0.5 cfs)
b. Medium (~ 0.5 cfs)
c. Low (< 0.5 cfs)
d. Frequent

Which of the following would not file a Notice of c. Compliance Inspector
Intent (NOI) prior to any land disturbing activities?


a. Secondary Permittee
b. Utility Provider
c. Compliance Inspector
d. Primary Permittee

Final site stabilization is achieved when percent b. 70%
vegetative cover on all disturbed areas is at least
the following:


a. 65%
b. 70%
c. 80%
d. 90%

The sediment control structure in the center right d. Rock spillway for a sediment trap
side of the photo above is a:


a. Rock-filter fabric inlet
b. Rock construction entrance
c. Rock ditch check
d. Rock spillway for a sediment trap

Document information

Uploaded on
August 14, 2024
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Queenstin
3.2
(5)
Sold
61
Followers
8
Items
5743
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions