12-24v e- e e e ecorrect eanswer.What eis ethe einput evoltage erange eof ethe eDoorbell eCam?
16.5 eVAC e- e e e ecorrect eanswer.What eis ethe eoutput evoltage eof ethe etransformer eused eto epower ethe
eSkyControl epanel?
true e- e e e ecorrect eanswer.True eor eFalse: eWhen eprogramming ea esensor einto ethe esky epanel eyou ecan
etype ein ethe eserial enumber eor e"learn" eit ein eby etriggering ethe edevice
2 e- e e e ecorrect eanswer.When eprogramming ea eDW21, ewhich eloop enumber eis eused?
1
2
3
beans eand ewire ecaps e- e e e ecorrect eanswer.Which eof ethe efollowing ematerials ecan eyou euse eto egroup
emultiple eground eterminals ein ea etakeover emodule: e
Solder
String e
Wire eCaps
Duct eTape
Beans
True e- e e e ecorrect eanswer.T eor eF: eWhen einstalling ethe efirefighter, eit eis erequired eto etest ethe
ecustomer's eexisting esmoke edetectors
, 3/4" e- e e e ecorrect eanswer.When einstalling ea eDW21, ewhat esize ebit eshould eyou euse eto edrill ethe ehole
efor ethe esensor?
1/2"
3/8"
3/4"
1"
True e- e e e ecorrect eanswer.T eor eF: eWhen einstalling ethe eTAKE-345, eyou emust eensure ethat ethe
etransformer eis esupplying e power eto ethe epower esupply ebefore ethe ebattery.
True e- e e e ecorrect eanswer.T eor eF: eYou eare erequired eto etest esignals efrom eall esecondary ekeypads eand
ekey efobs eeven ethough ethey eare enot edetection edevices
False e- e e e ecorrect eanswer.T eor eF: eWhen erunning epower eto ethe eTAKE-345 epolarity edoes enot eapply
e - e e e ecorrect eanswer.What eis ethe ecorrect eheight eat ewhich eto einstall ethe ePIR2?
7 eft e
At eleast e5 eft
At eleast e7 eft
At e7.5 eft
How ewould eyou eprogram ea eCO3 eif emounted eon ea ehallway ewall?
Loop e1 eZone e8
Loop e1 eZone e14
Loop e3 eZone e4
Loop e1 eZone e4 e- e e e ecorrect eanswer.
When einstalling ea eDW21 einto ea emetal edoor eframe, ewith ea ewooden edoor, ewhat eshould eyou ebe esure
eto euse?
Metal eDrill ebit
Correct Answers.
12-24v e- e e e ecorrect eanswer.What eis ethe einput evoltage erange eof ethe eDoorbell eCam?
16.5 eVAC e- e e e ecorrect eanswer.What eis ethe eoutput evoltage eof ethe etransformer eused eto epower ethe
eSkyControl epanel?
true e- e e e ecorrect eanswer.True eor eFalse: eWhen eprogramming ea esensor einto ethe esky epanel eyou ecan
etype ein ethe eserial enumber eor e"learn" eit ein eby etriggering ethe edevice
2 e- e e e ecorrect eanswer.When eprogramming ea eDW21, ewhich eloop enumber eis eused?
1
2
3
beans eand ewire ecaps e- e e e ecorrect eanswer.Which eof ethe efollowing ematerials ecan eyou euse eto egroup
emultiple eground eterminals ein ea etakeover emodule: e
Solder
String e
Wire eCaps
Duct eTape
Beans
True e- e e e ecorrect eanswer.T eor eF: eWhen einstalling ethe efirefighter, eit eis erequired eto etest ethe
ecustomer's eexisting esmoke edetectors
, 3/4" e- e e e ecorrect eanswer.When einstalling ea eDW21, ewhat esize ebit eshould eyou euse eto edrill ethe ehole
efor ethe esensor?
1/2"
3/8"
3/4"
1"
True e- e e e ecorrect eanswer.T eor eF: eWhen einstalling ethe eTAKE-345, eyou emust eensure ethat ethe
etransformer eis esupplying e power eto ethe epower esupply ebefore ethe ebattery.
True e- e e e ecorrect eanswer.T eor eF: eYou eare erequired eto etest esignals efrom eall esecondary ekeypads eand
ekey efobs eeven ethough ethey eare enot edetection edevices
False e- e e e ecorrect eanswer.T eor eF: eWhen erunning epower eto ethe eTAKE-345 epolarity edoes enot eapply
e - e e e ecorrect eanswer.What eis ethe ecorrect eheight eat ewhich eto einstall ethe ePIR2?
7 eft e
At eleast e5 eft
At eleast e7 eft
At e7.5 eft
How ewould eyou eprogram ea eCO3 eif emounted eon ea ehallway ewall?
Loop e1 eZone e8
Loop e1 eZone e14
Loop e3 eZone e4
Loop e1 eZone e4 e- e e e ecorrect eanswer.
When einstalling ea eDW21 einto ea emetal edoor eframe, ewith ea ewooden edoor, ewhat eshould eyou ebe esure
eto euse?
Metal eDrill ebit